- Page 1 and 2: (Ref DJM/CS/REV 10)
- Page 3 and 4: Delivering strong, safe, resilient
- Page 5 and 6: • a delivery strategy for achievi
- Page 7 and 8: Option considered Reason why not pu
- Page 9 and 10: Fig 1: Relationship to a single Cor
- Page 11 and 12: 3.2 Economy (a) Unemployment in sou
- Page 13 and 14: (b) Life expectancy in south Wiltsh
- Page 15 and 16: the north east of south Wiltshire,
- Page 17 and 18: 4.3(e) The need to retain an adequa
- Page 19 and 20: 4.5 Identifying barriers which prev
- Page 21 and 22: 4.8(c) Treating flood risk South Wi
- Page 23 and 24: 5. The Core Strategy Spatial Vision
- Page 25 and 26: Desired outcomes: • Identificatio
- Page 27 and 28: 5.9 Strategic Objective 8: Where al
- Page 29 and 30: practice 43 . A hierarchy has been
- Page 31: within south Wiltshire. A further 4
- Page 34 and 35: 6.13 An example of how this Strateg
- Page 36 and 37: Planned Growth: Tisbury Local Servi
- Page 38 and 39: 6.22 Work has been carried out with
- Page 40 and 41: 6.24 Managing delivery of the spati
- Page 42 and 43: (d)Green Infrastructure Creation of
- Page 44 and 45: can be managed effectively. Further
- Page 46 and 47: housing to be affordable. Based on
- Page 48 and 49: effects on river quality, biodivers
- Page 52 and 53: 7. Applying the Spatial Strategy to
- Page 54 and 55: the city centre bringing benefits f
- Page 56 and 57: Core Policy 6- Meeting Salisbury's
- Page 58 and 59: egional function and reinforce its
- Page 60 and 61: 7.28 Managing Delivery of the Strat
- Page 62 and 63: • The careful planning of the maj
- Page 64 and 65: Scheduled Ancient Monument. To miti
- Page 66 and 67: perimeter buffers between roads and
- Page 68 and 69: 8.3 There is a local concern that W
- Page 70 and 71: 9. Applying the Spatial Strategy to
- Page 72 and 73: 9.5 The villages of Durrington (inc
- Page 74 and 75: also designated as a Special Area o
- Page 76 and 77: 9.24 Ensuring essential infrastruct
- Page 78 and 79: 10. Applying the Spatial Strategy t
- Page 80 and 81: 10.12 The type of houses that are n
- Page 82 and 83: 11. Applying the Spatial Strategy t
- Page 84 and 85: 11.11 The type of houses that are n
- Page 86 and 87: 12. Applying the Spatial Strategy t
- Page 88 and 89: 12.6 Providing a decent affordable
- Page 90 and 91: 13. Managing Development - Setting
- Page 92 and 93: Core Policy 20- Pollution and phosp
- Page 94 and 95: 13.5 Within south Wiltshire there a
- Page 96 and 97: Core Policy 24 - Hotels, Bed and Br
- Page 98 and 99: 14. Managing and monitoring the del
- Page 100 and 101:
Action Further Work Delivery Vehicl
- Page 102 and 103:
Site Name Hampton Park Map Site Des
- Page 104 and 105:
of adoption of the Core Strategy.
- Page 106 and 107:
Wiltshire Design Guide, 'Creating P
- Page 108 and 109:
Site Name Land at The Maltings and
- Page 110 and 111:
Transportation: Any major infrastru
- Page 112 and 113:
eyond. To the west of the engine sh
- Page 114 and 115:
other employment sites within this
- Page 116 and 117:
etained • Setting and views to an
- Page 118 and 119:
Site Name Land South of Netherhampt
- Page 120 and 121:
oth residential and commercial and
- Page 122 and 123:
Community infrastructure and approx
- Page 124 and 125:
Site Name King’s Gate, Amesbury M
- Page 126 and 127:
and east. New hedgerow planting esp
- Page 128 and 129:
• There is no recorded public sur
- Page 130 and 131:
The following policies contained in
- Page 132 and 133:
For the time being, the following p
- Page 134 and 135:
Policy TR12 TR13 TR14 TR15 TR16 TR1
- Page 136:
Appendix D Map of Strategic growth
- Page 139 and 140:
Strategic Objective 1: To ensure so
- Page 141 and 142:
Strategic Objective 2: To provide e
- Page 143 and 144:
Strategic Objective 3: To deliver a
- Page 145 and 146:
Strategic Objective 5: To deliver n
- Page 147 and 148:
Liaison Conservation area appraisal
- Page 149 and 150:
Regional ES1 Economic Prosperity TO
- Page 151 and 152:
Condition of River Avon SAC. Achiev
- Page 153 and 154:
pollutant and climate change emissi
- Page 155 and 156:
TABLE 1: CHANGED LOCAL PLAN MAPS MA
- Page 157 and 158:
MAP NO MAP NAME POLICIES AND RESTRA
- Page 159 and 160:
MAP NO MAP NAME POLICIES AND RESTRA
- Page 161 and 162:
TABLE 2: DELETED LOCAL PLAN MAPS MA
- Page 163 and 164:
MAP NO MAP NAME POLICIES AND RESTRA
- Page 165 and 166:
Appendix G Glossary and Common Acro
- Page 167 and 168:
MUGA Multi Use Games Area MWDF Mine
- Page 169 and 170:
Appendix H Housing Trajectories Ful
- Page 171 and 172:
Delivery of the Strategic Sites 120
- Page 173 and 174:
Appendix I Risk Analysis of South W
- Page 175 and 176:
Potential Risk Implications Mitigat