Operator’s <strong>Manual</strong><br />

3.5. ELECTRICAL INSTALLATION<br />

For installation of electrical equipment observe the following:<br />

-- Observe regulations of local electricity supply company.<br />

-- Arrange for the electrics to be connected by an electrician only.<br />

-- If control devices are delivered by the factory refer to the appropriate wiring diagram.<br />

-- Ensure correct installation of protective conductor.<br />

-- Check conformity of motor and control device tension and frequency with those of electric network.<br />

-- The necessary cables, main fuses and main switch are to be provided by the customer. The fusing should be done in accordance<br />

with the regulations of the responsible electricity supply company.<br />

-- Adjust motor protection, thermal overload relay. For start over contactor adjust to motor amperage rating. For start via star--delta<br />

contactor adjust to motor amperage rating x 0.58.<br />

For example: motor amperage rating = 10 Amp.:<br />

Adjust relay to 10 x 0.58 = 5.8 Amp.<br />

-- When connecting the unit to the electrical supply, check direction of rotation for agreement with arrow on unit.<br />

-- Fuse motor correctly (see table below; use slow -blow fuses).<br />

FUSE TABLE<br />

Motor type Voltage V 125 220 240 380 415 440 500 600 660<br />

3--phase, 2.2 kW<br />

(star--delta starting)<br />

current A 20 10 10 6 6 6 6 4 4<br />

3--phase, 2.2 kW<br />

(direct starting)<br />

current A 25 16 16 10 10 6 6 6 6<br />

3--phase, 3 kW<br />

(star--delta starting)<br />

current A 25 16 16 10 10 10 10 6 4<br />

3--phase, 3 kW<br />

(direct starting)<br />

current A 35 20 20 16 16 10 10 6 6<br />

3--phase, 4 kW<br />

(star--delta starting)<br />

current A 35 20 20 10 -- -- 10 10 10 6<br />

3--phase, 4 kW<br />

(direct starting)<br />

current A 35 25 25 16 -- -- 16 16 10 10<br />

3--phase, 5.5 kW<br />

(star--delta starting)<br />

current A 50 25 25 16 16 16 10 10 10<br />

3--phase, 5.5 kW<br />

(direct starting)<br />

current A 63 35 35 20 20 20 16 16 16<br />

3--phase, 7.5 kW<br />

(star--delta starting)<br />

current A 50 35 35 20 16 16 16 16 10<br />

3--phase, 7.5 kW<br />

(direct starting)<br />

current A 63 35 35 25 25 25 20 16 16<br />

3--phase, 11 kW<br />

(star--delta starting)<br />

current A -- -- 50 50 25 25 25 20 20 16<br />

3--phase, 11 kW<br />

(direct starting)<br />

current A -- -- 63 50 35 35 35 25 25 25<br />

3--phase, 15 kW<br />

(star--delta starting)<br />

current A -- -- 63 63 35 35 35 25 25 20<br />

3--phase, 15 kW<br />

(direct starting)<br />

current A -- -- 80 80 50 35 35 35 35 25<br />

3--phase, 18.5 kW<br />

(star--delta starting)<br />

current A -- -- 80 63 50 50 35 35 25 25<br />

3--phase, 18.5 kW<br />

(direct starting)<br />

current A -- -- 100 80 63 50 50 50 35 35<br />