Bill Adams (Georgia Power) - ecedha

Bill Adams (Georgia Power) - ecedha Bill Adams (Georgia Power) - ecedha

Southern Company Transmission<br />

<strong>Georgia</strong> Control Center


North American Electric Reliability<br />

Corporation (NERC)<br />

Eastern Interconnect<br />

• ~700,000 MWs interconnected and<br />

operated synchronously.<br />

• Operations and transactions must<br />

be closely coordinated.<br />

• Ability to “lean” on others aids the<br />

reliability of all participants.<br />

• However, distant events can have<br />

widespread impacts.


<strong>Georgia</strong> <strong>Power</strong> Company Transmission<br />

• Transmission Lines<br />

o 46 kV & 69 kV – 3,520 miles<br />

o 115 kV – 5,553 miles<br />

o 230 kV – 2,158 miles<br />

o 500 kV – 1,100 miles<br />

• Substations<br />

o 227 Trans. and Gen.<br />

o 1955 Distribution<br />

• Load Data<br />

o So. Control Area: 48,000 MW<br />

o GPC: 29,800 MW


Tie Lines and Control Centers<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆ ∆ ∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆<br />

∆ ∆<br />

∆<br />

∆<br />

• Tie Lines are the<br />

transmission lines<br />

connecting electric<br />

utilities<br />

• There are 53 Tie<br />

Lines that connect<br />

Southern Company to<br />

neighboring utilities in<br />

the Southeast


Southern Company Operations<br />

• <strong>Power</strong> Coordination Center<br />

o System Balancing Authority<br />

o Reliability Coordinator<br />

o Monitor Interface Flows<br />

o Facilitate Transmission Transactions<br />

• Local Transmission Control Centers<br />

o Monitor and Control the Transmission System<br />

o Facilitate Work Requests<br />

o Local Security<br />

o Restoration<br />

• Distribution Control Centers<br />

o Monitor and Control Distribution Breakers and Feeders<br />

o Communicate with distribution customers


How Does the GCC Function<br />

Pre-Arrange<br />

process requests,<br />

write safe<br />

switching orders,<br />

communicate with<br />

personnel<br />

Security<br />

study transmission<br />

work requests to<br />

ensure the work is<br />

done in a way to<br />

keep grid reliable<br />

Floor Operators<br />

Support<br />

Engineers<br />

provide technical<br />

guidance as<br />

needed<br />

System<br />

Operators (SO)<br />

ensure reliability<br />

and security of the<br />

transmission grid<br />

in GA<br />

Area<br />

Operators<br />

monitor and<br />

control the<br />

transmission grid<br />

in GA in real-time


Desk Responsibilities<br />

• Area Desks<br />

o Monitor system conditions<br />

o Monitor and respond to alarms<br />

o Issue switching orders<br />

More than 27,000 in 2010<br />

o Respond to emergency conditions<br />

o Dispatch field personnel as needed


Desk Responsibilities Continued<br />

• System Operator Desk<br />

o Perform contingency analysis and security studies<br />

o Develop operating solutions for identified<br />

contingencies<br />

o Monitor system voltage schedule<br />

o Analyze outages and assist Area desk with<br />

restoration plans<br />

o Communicate with PCC and external entities


Other Functions<br />

• Pre-Arrange<br />

o Coordinate all work requests for facility outages<br />

More than 12,000 in 2010<br />

o Verify feasibility of work requests through System<br />

Security<br />

o Write accurate and safe switching orders<br />

o Notify all impacted parties of work requests<br />

o Compile and distribute the daily work summary


Other Functions Continued<br />

• System Security<br />

o Conduct security studies/perform contingency<br />

analysis for outage requests<br />

o Develop necessary operating solutions to facilitate<br />

major construction projects<br />

o Coordinate with Transmission Planning group to help<br />

plan to build reliable system<br />

o Conduct annual Summer Operating Study and report<br />

results


Other Functions Continued<br />

• Support Engineers<br />

o Provide technical support to other GCC groups<br />

o Collect and distribute data from the field<br />

o Verify equipment data with field personnel and other<br />

operating companies<br />

o Produce and maintain operating procedures (e.g.<br />

Blackstart)<br />

o Fault Data Analysis


Operator Tools<br />

• Energy Management System (EMS)<br />

o PNA (<strong>Power</strong> Network Analysis) –view real-time data<br />

from EMS and also perform and build case studies<br />

o OPNA (Offline PNA) – perform studies and N-1<br />

contingency analysis<br />

o EMo (Electronic Monitor) – view real-time status to<br />

get the “big picture” quickly<br />

o Dynamic Line Rating<br />

o Fault Location


Operator Tools<br />

• Other Simulation and Viewing Tools<br />

o <strong>Power</strong>World – view real-time flows, also “big picture”<br />

o PSS/E – perform studies and in-depth contingency<br />

analysis using modified planning model<br />

o TransMap<br />

o GenVarr<br />

o Situational Awareness


Operator Tools<br />

EMS Real-time Screenshot Example


Software Tools<br />

<strong>Power</strong>World Real-time Screenshot Example


958<br />

1088<br />

1084<br />

9<br />

5<br />

7<br />

3<br />

7<br />

3<br />

A<br />

BRYANT TVA<br />

MORGANVILLE<br />

161/46/12 KV<br />

PRE. 151<br />

5 1<br />

7<br />

TVA<br />

WIDOWS CREEK<br />

230/161 KV<br />

CRAWFISH<br />

CREEK<br />

PRE. 181<br />

NGEMC YOUNG<br />

(N. LAFAYETTE)<br />

115/25 KV<br />

PRE. 002<br />

B A<br />

5<br />

LTC LTC<br />

783 793<br />

5<br />

787<br />

791<br />

5<br />

717<br />

AIM<br />

3<br />

RLB<br />

1<br />

RLB<br />

9<br />

058<br />

7 5<br />

151001<br />

151006<br />

5<br />

NC<br />

A<br />

TVA Line<br />

9 5<br />

814<br />

3<br />

161 Meter M<br />

9 5<br />

824<br />

3<br />

9 5<br />

858<br />

3<br />

7<br />

898<br />

5 9<br />

OGLETHORPE<br />

161/12 KV<br />

9<br />

13.0 Reactor<br />

5<br />

258<br />

5<br />

7<br />

5 797 017<br />

7 AOM<br />

217 227<br />

5 068 ROCK SPRINGS<br />

230/161/115 KV<br />

799 9<br />

PRE. 129<br />

45 MVAR<br />

9 3 LAFAYETTE<br />

PRE. 002<br />

5 738 730<br />

747 5<br />

7 1 AOM<br />

7 7<br />

627<br />

5 717<br />

AOM<br />

5<br />

5 758<br />

AOM<br />

728<br />

9<br />

061441<br />

BLD<br />

061453<br />

RLB<br />

851<br />

BLD<br />

9<br />

061469<br />

BLD<br />

5<br />

876<br />

717<br />

AIM<br />

5<br />

FUTURE<br />

TVA<br />

(4)981709<br />

TVA SW.<br />

LAFAYETTE<br />

CITY #3<br />

115/12 PRE. 141<br />

703<br />

A<br />

9<br />

448<br />

5 7<br />

417 7<br />

AOM<br />

458<br />

9<br />

TVA Switches<br />

161KV<br />

4<br />

938<br />

3<br />

9 7 9<br />

NO<br />

NO<br />

903<br />

3 3 3<br />

934 924 914 AIM<br />

5<br />

929 5 919 5<br />

NO NO<br />

#3 #2 #1<br />

NGEMC CATOOSA<br />

161/12 KV NGEMC EDWARDS<br />

Replaces paper & pins<br />

PRE. 009<br />

161/25/12 KV<br />

PRE. 009<br />

CHICKAMAUGA 115/25/12 KV<br />

NGEMC<br />

PRE. 002 (NGEMC) (GPC/TVA)<br />

KENSINGTON<br />

B A<br />

#2 1B 1A<br />

LTC LTC<br />

LTC<br />

763<br />

LTC LTC<br />

230/25 KV<br />

2657 2647 2767 002637<br />

5<br />

AIM<br />

5<br />

AIM AIM<br />

5<br />

AIM<br />

5<br />

TVA<br />

725<br />

002771<br />

TVA GPC<br />

BLD<br />

TVA Sw.<br />

Line<br />

713 714<br />

5<br />

723<br />

431<br />

BLD<br />

859 1 3<br />

853 5 LTC NGEMC BRISON<br />

RLB<br />

PRE. 028<br />

866<br />

5<br />

1 3<br />

916<br />

5<br />

809<br />

917<br />

LTC<br />

AIM<br />

803 827<br />

926<br />

805<br />

823 TRION 115/12 KV<br />

BLD 5<br />

PRE. 028<br />

801<br />

LTC<br />

DUG GAP (NGEMC)<br />

115/12 KV<br />

PRE. 028<br />

459<br />

BLD<br />

427<br />

AIM<br />

203<br />

BLD<br />

LTC<br />

3<br />

217<br />

RLB<br />

201<br />

BLD<br />

NGEMC<br />

443 ROPER<br />

BLD 115/12<br />

9<br />

PRE. 163<br />

RIEGEL TEXTILE<br />

(MT. VERNON MILLS)<br />

PRE. 138<br />

BK 1<br />

BK 2<br />

Operator Tools<br />

TransMap - Electronic Mimic Board<br />

with electronic board<br />

5<br />

5<br />

3<br />

826<br />

AIM<br />

1<br />

NGEMC<br />

GPC<br />

243<br />

BLD<br />

241<br />

PLAIN /<br />

WHIPS<br />

5<br />

941 DALTON CITY #2<br />

RLB SHUGART ROAD<br />

5 5 PRE. 067<br />

5<br />

917 953<br />

AIM BLD<br />

388<br />

9 7<br />

5<br />

551 5<br />

BLD<br />

577 AIM<br />

5<br />

553<br />

RLB 567 AIM<br />

#2 #1<br />

LTC LTC<br />

3<br />

5 816<br />

AIM<br />

1<br />

378<br />

9 7<br />

5<br />

338<br />

9 7<br />

3 310 5<br />

45<br />

331 311<br />

MVAR<br />

327<br />

3 321<br />

5<br />

DALTON<br />

PRIMARY 317<br />

PRE. 028 AOM<br />

B<br />

A<br />

NGEMC HASSLER<br />

PRE. 140<br />

5<br />

809<br />

851 853<br />

RLB BLD<br />

251 5 263<br />

5<br />

RLB BLD<br />

217 5 DALTON<br />

AIM<br />

CITY #10<br />

PRE. 112<br />

DALTON CITY #9<br />

115/25 KV<br />

PRE. 033<br />

7<br />

7<br />

7<br />

5<br />

358<br />

5<br />

348<br />

5<br />

368<br />

LTC<br />

#2<br />

LTC<br />

#1<br />

9<br />

9<br />

9<br />

RED<br />

WHITE<br />

BLACK<br />

5<br />

5<br />

LTC<br />

017<br />

ANTIOCH<br />

ROAD<br />

PRE. 211<br />

9<br />

5 148 318 9 5<br />

5<br />

7 214 7<br />

7 117 9 7<br />

5 AOM 308 5<br />

138<br />

9<br />

9<br />

027<br />

AIM<br />

061<br />

7<br />

006<br />

CS/AIM<br />

LINE GRD. 716 726<br />

80 AMP<br />

5 719 717<br />

TUNNEL<br />

HILL<br />

PRE. 192<br />

DALTON<br />

CITY #7<br />

PRE. 126<br />

B<br />

5 017<br />

AIM<br />

5<br />

051<br />

NO<br />

E. DALTON<br />

E. DALTON<br />

E. DALTON<br />

5<br />

581<br />

BLD<br />

5<br />

A<br />

5<br />

RINGGOLD<br />

PRE. 027<br />

5<br />

1<br />

716 5<br />

3<br />

583<br />

RLB<br />

709<br />

381 5<br />

BLD<br />

393<br />

RLB<br />

DALTON<br />

CITY #1<br />

PRE. 029<br />

5<br />

227<br />

AIM<br />

203<br />

RLB 201<br />

RLB<br />

1<br />

726<br />

3<br />

#1 #2<br />

LTC LTC<br />

704<br />

AIM<br />

SWITCHES IN<br />

KIKER SUB.<br />

153609<br />

153519<br />

RLB<br />

027781<br />

BLD<br />

5<br />

5<br />

153511<br />

BLD<br />

967<br />

AIM<br />

983<br />

5<br />

501 509<br />

RLB RLB<br />

5<br />

506<br />

80 AMP<br />

VARNELL<br />

PRE. 153<br />

DALTON<br />

CITY #4<br />

PRE. 028<br />

BK B BK A<br />

957<br />

AIM<br />

991<br />

BLD<br />

673 671<br />

BLD BLD<br />

679<br />

BLD<br />

3<br />

707<br />

NGEMC<br />

100 A<br />

WHITFIELD<br />

767<br />

713 IND. PARK<br />

AOM<br />

NGEMC 3<br />

TILTON<br />

PRE. 027<br />

NGEMC<br />

CENTER POINT<br />

PRE. 033<br />

5<br />

5<br />

NGEMC<br />

WHITFIELD<br />

PRE. 027<br />

B<br />

5<br />

757<br />

AOM<br />

157<br />

AIM<br />

181<br />

RLB<br />

5<br />

5<br />

DALTON<br />

CITY #8<br />

PRE. 112<br />

3<br />

A<br />

CALHOUN #1<br />

PRE. 027<br />

5<br />

883<br />

893<br />

5<br />

887 897<br />

AIM 5 AIM<br />

743<br />

BLD 741<br />

BLD<br />

147<br />

AIM<br />

173<br />

RLB<br />

019213<br />

RLB<br />

717<br />

AIM<br />

3<br />

A<br />

019211<br />

5<br />

727<br />

AIM<br />

LTC<br />

B<br />

PRE. 027<br />

3


Reliability Tools<br />

• Weather Forecasts<br />

• Lightning Tracker<br />

• Fault Data Analysis<br />

• Geographic Information System<br />

• Summer Operating Study<br />

• Sub-Transmission Automation


Weather Reports


• FALLS…<br />

Fault<br />

Analysis<br />

and<br />

Lightning<br />

Location<br />

System<br />

Determine Location of Lightning Event


Operator Tools<br />

EMS Real-time Screenshot Example


Summer Operating Database - Overload


Current Issues<br />

• Reliability Standards<br />

• Cyber Security<br />

• Employee Skills and Training<br />

• Staffing