Track Record 42, January to March 2010 - Public Transport Victoria
Track Record 42, January to March 2010 - Public Transport Victoria
Track Record 42, January to March 2010 - Public Transport Victoria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 2 Cancellations of trains, trams and buses, <strong>March</strong> quarter 2009 <strong>to</strong> <strong>March</strong> quarter <strong>2010</strong><br />
Jan–Mar<br />
2009<br />
Apr–Jun<br />
2009<br />
Jul–Sept<br />
2009<br />
Oct-Dec<br />
2009<br />
Jan–Mar<br />
<strong>2010</strong><br />
Metropolitan trains<br />
% of timetable not delivered<br />
% of network cancellations<br />
3.0<br />
2.8<br />
0.8<br />
0.6<br />
0.8<br />
0.6<br />
1.2<br />
1.0<br />
1.5<br />
1.2<br />
Metropolitan trams<br />
% of timetable not delivered<br />
% of network cancellations<br />
1.1<br />
0.4<br />
0.8<br />
0.2<br />
0.6<br />
0.1<br />
0.7<br />
0.2<br />
0.9<br />
0.3<br />
V/Line Passenger<br />
trains<br />
% of network cancellations 3.5 1.4 1.1 1.7 2.0<br />
Metropolitan buses % of network cancellations 0.1 0.1 0.1 0.1 0.1<br />
Figure 2 Cancellations of trains, trams and buses, <strong>March</strong> quarter 2009 <strong>to</strong> <strong>March</strong> quarter <strong>2010</strong>*<br />
Percentage of services cancelled<br />
4.0<br />
3.5<br />
3.0<br />
2.5<br />
2.0<br />
1.5<br />
1.0<br />
0.5<br />
0.0<br />
Jan–Mar 2009 Apr–Jun 2009 Jul–Sept 2009<br />
Metropolitan buses<br />
Metropolitan trams<br />
V/Line Passenger trains<br />
Metropolitan trains<br />
Oct–Dec 2009 Jan–Mar <strong>2010</strong><br />
*Figure 2 reflects the new reliability measure of percentage of timetable not delivered for metropolitan trains and trams.<br />
7<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>42</strong>