13.01.2015 Views

Track Record 42, January to March 2010 - Public Transport Victoria

Track Record 42, January to March 2010 - Public Transport Victoria

Track Record 42, January to March 2010 - Public Transport Victoria

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 1<br />

Introduction and Summary<br />

1.1 Introduction<br />

This edition of <strong>Track</strong> <strong>Record</strong> provides details on the performance of public transport services in Vic<strong>to</strong>ria for the<br />

period from <strong>January</strong> <strong>to</strong> <strong>March</strong> <strong>2010</strong> (referred <strong>to</strong> as the <strong>March</strong> quarter <strong>2010</strong>).<br />

New franchise contracts for the operation of Melbourne’s passenger train and tram networks commenced on<br />

30 November 2009. Metro Trains Melbourne (operating as Metro) and Keolis Downer EDI (operating as Yarra<br />

Trams (KDR)) are the current opera<strong>to</strong>rs.<br />

The new contracts and cus<strong>to</strong>mer charters include revised definitions for punctuality and reliability measures<br />

and new service level thresholds for passenger compensation:<br />

• Metropolitan trains and tram services are now regarded as punctual if they arrive no earlier than 59 seconds<br />

before and no later than four minutes and 59 seconds after the timetabled arrival time.<br />

• Reliability for metropolitan trains and trams is now based on the percentage of the timetable delivered.<br />

Performance measures for regional trains and coaches and for metropolitan buses are unchanged.<br />

Further explanations and threshold details are outlined in the Glossary at the back of this bulletin.<br />

To enable comparisons of current and past performance, punctuality and reliability figures based on both the<br />

new and former measures are provided in Section 2 of this bulletin.<br />

Please note:<br />

Metropolitan trains =<br />

Connex (up <strong>to</strong> and including<br />

November 29, 2009) and Metro<br />

(from November 30, 2009)<br />

Metropolitan trams =<br />

Yarra Trams operated by Metrolink (up <strong>to</strong><br />

and including November 29, 2009) and<br />

KDR (from November 30, 2009 onwards)<br />

Regional trains<br />

= V/Line Passenger<br />

3<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>42</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!