2.3 Passenger compensation<br />

Metroplitan trains Metropolitan trams V/Line Passenger trains<br />

Passenger compensation was<br />

payable in <strong>January</strong>, February and<br />

<strong>March</strong> as network punctuality was<br />

below the applicable threshold.<br />

No passenger<br />

compensation was<br />

payable in the<br />

<strong>March</strong> quarter <strong>2010</strong>.<br />

Passenger compensation<br />

was payable in <strong>January</strong> and<br />

February as punctuality was<br />

below the applicable threshold<br />

on all corridors except Ararat.<br />

Passenger compensation<br />

was payable in <strong>March</strong> as<br />

punctuality was below the<br />

applicable threshold on all<br />

corridors. Reliability on the<br />

Sheppar<strong>to</strong>n line was also<br />

below the relevant threshold.<br />

For details of thresholds for passenger compensation, please refer <strong>to</strong> the Glossary on page 20.<br />