Track Record 42, January to March 2010 - Public Transport Victoria
Track Record 42, January to March 2010 - Public Transport Victoria
Track Record 42, January to March 2010 - Public Transport Victoria
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2.3 Passenger compensation<br />
Metroplitan trains Metropolitan trams V/Line Passenger trains<br />
Passenger compensation was<br />
payable in <strong>January</strong>, February and<br />
<strong>March</strong> as network punctuality was<br />
below the applicable threshold.<br />
No passenger<br />
compensation was<br />
payable in the<br />
<strong>March</strong> quarter <strong>2010</strong>.<br />
Passenger compensation<br />
was payable in <strong>January</strong> and<br />
February as punctuality was<br />
below the applicable threshold<br />
on all corridors except Ararat.<br />
Passenger compensation<br />
was payable in <strong>March</strong> as<br />
punctuality was below the<br />
applicable threshold on all<br />
corridors. Reliability on the<br />
Sheppar<strong>to</strong>n line was also<br />
below the relevant threshold.<br />
For details of thresholds for passenger compensation, please refer <strong>to</strong> the Glossary on page 20.<br />
8