ncr/doc/RealPOS/7455/Technical_Manuals/7455_Re... - Alsys Data
ncr/doc/RealPOS/7455/Technical_Manuals/7455_Re... - Alsys Data
ncr/doc/RealPOS/7455/Technical_Manuals/7455_Re... - Alsys Data
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter 2: Hardware Installation 2-19<br />
Finalizing the Installation<br />
After the hardware installation has been completed, the terminal can<br />
be powered up to finalize the installation. The operating system, along<br />
with platform modifications, is pre-installed. The following sections list<br />
the steps involved to complete the system installation for each of the<br />
Gold Disk operating systems.<br />
Completing the OS Installation (Windows 2000)<br />
Power on the system to complete the software installation. This<br />
installation also installs most of the additional software and drivers<br />
that are included in the disk image. Complete the installation as<br />
follows.<br />
1. After the terminal reboots, press Next at the Windows Setup screen.<br />
2. Accept the Microsoft license agreement.<br />
3. Enter the User Name and Organization.<br />
4. Enter the Computer Name for the client.<br />
5. Enter the Administrator’s Account Password (optional).<br />
6. When prompted, press Finish to reboot the client.<br />
7. Loginwhenprompted.<br />
8. If you have a touch screen equipped unit, open the Control Panel<br />
and run the MicroTouch screen calibration.<br />
Completing the OS Installation (Windows NT)<br />
Power on the system to complete the software installation. This<br />
installation also installs most of the additional software and drivers<br />
that are included in the disk image. Complete the installation as<br />
follows.<br />
1. After the terminal reboots, press Next at the Windows Setup screen.<br />
2. Accept the Microsoft license agreement.<br />
3. Enter the User Name and Organization.