13.01.2015 Views

ncr/doc/RealPOS/7455/Technical_Manuals/7455_Re... - Alsys Data

ncr/doc/RealPOS/7455/Technical_Manuals/7455_Re... - Alsys Data

ncr/doc/RealPOS/7455/Technical_Manuals/7455_Re... - Alsys Data

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2-4 Chapter 2: Hardware Installation<br />

Routing the Cables<br />

The <strong>7455</strong> contains three anchors to secure cables to the base of the unit<br />

using a cable tie wrap. <strong>Re</strong>move the power supply cover from the base<br />

of the unit, which is secured by two screws on the bottom rear. Use a<br />

tie wrap to secure the Ethernet cable to one of the provided molded<br />

cable tie holders on the base. This should provide sufficient strain relief<br />

to prevent the cable from becoming tight and damaging the connector<br />

on the Processor Board.<br />

The peripheral cables are routed down through the Mount Assembly<br />

and out the rear of the unit.<br />

Bottom View<br />

18366

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!