13.01.2015 Views

national horticulture mission 2012 -2013 the nilgiris

national horticulture mission 2012 -2013 the nilgiris

national horticulture mission 2012 -2013 the nilgiris

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I Production of Planting Materials<br />

1 Public Sector :<br />

NATIONAL HORTICULTURE MISSION <strong>2012</strong> -<strong>2013</strong> THE NILGIRIS<br />

Schemes implemented in Nilgiris during <strong>2012</strong> - <strong>2013</strong><br />

S.No Name of <strong>the</strong> Component Block Unit<br />

PHYSICAL<br />

In HA / No<br />

FINANCIAL<br />

In Lakhs<br />

Vegetable Seed Production @Rs.0.500 Lakhs<br />

/Ha<br />

2 Private Sector :<br />

Udhagai Ha 40 20.00<br />

Small Nursery (1 Ha) @ Rs.3.125 lakhs/Ha Udhagai No. 2 6.25<br />

II<br />

Establishment of New Garden/Area<br />

Expansion<br />

Spices : (For a maximum of 4.00 ha per<br />

beneficiary)<br />

1 Ginger:<br />

Rs.25000/= per ha Maximum of Rs.12500/= per<br />

Ha (50% cost of meeting <strong>the</strong> expenditure on<br />

planting materials and cost of materials for<br />

INM/IPM etc)<br />

2 Clove and Nutmeg :<br />

Rs.40000/= per ha Maximum of Rs.20000/= per<br />

Ha (50% cost of meeting <strong>the</strong> expenditure on<br />

planting materials and cost of materials for<br />

INM/IPM etc)<br />

3 Black Pepper :<br />

Rs.40000/= per ha Maximum of Rs.20000/= per<br />

Ha (50% cost of meeting <strong>the</strong> expenditure on<br />

planting materials and cost of materials for<br />

INM/IPM etc)<br />

Gudalur Ha 100 12.50<br />

Gudalur Ha 20 4.00<br />

Gudalur Ha 15 3.00<br />

III<br />

Protected Cultivation (Area in Ha.)<br />

Naturally ventilated System -Tubular Structure @<br />

4000 sq.mt./beneficiary Rs.650/= per sq.mt.<br />

50% of cost i.e Rs 325/= per sq.mt.<br />

Udhagai Sq.mt 9000 29.25<br />

Coonoor Sq.mt 8000 26.00<br />

Kotagiri Sq.mt 8000 26.00<br />

IV Organic Farming :<br />

1 Vermi compost units (permanent structure)<br />

Rs.60,000/- per unit - 50% of cost conforming to<br />

<strong>the</strong> size of <strong>the</strong> unit of 30'x8'x2.5' dimension of<br />

permanent structure to be administrated on pro -<br />

rata basis.ie.Rs.30,000/- per unit<br />

Udhagai No. 2 0.600<br />

Coonoor No. 1 0.300<br />

Kotagiri No. 1 0.300<br />

Gudalur No. 1 0.300


S.No<br />

Name of <strong>the</strong> Component<br />

Block Unit<br />

PHYSICAL FINANCIAL<br />

In HA / No In Lakhs<br />

2 Vermi compost units (HDPE Vermi bed)<br />

Udhagai No. 5 0.25<br />

Rs.10,000/- per unit - 50% of cost conforming to<br />

Coonoor No. 5 0.25<br />

<strong>the</strong> size of 96 cft (12'x4'x2') to be administrated<br />

on pro - rata basis.ie.Rs.5,000/- per unit Kotagiri No. 5 0.25<br />

Gudalur No. 5 0.25<br />

V Pollination Support through Bee keeping :<br />

1 Honey Bee Colonies Kotagiri No. 50 0.35<br />

Gudalur No. 50 0.35<br />

2 Bee Hives Kotagiri No. 50 0.40<br />

Gudalur No. 50 0.40<br />

3 Equipment Kotagiri No. 2 0.153<br />

Gudalur No. 1 0.077<br />

VI Horticulture Mechanisation :<br />

Udhagai No. 3 0.525<br />

Power operated machines /Tools<br />

Coonoor No. 3 0.525<br />

Kotagiri No. 2 0.35<br />

Gudalur No. 2 0.35<br />

VII Human Resource Development (HRD)<br />

1. a (c)Training of farmers<br />

Udhagai No. 100<br />

(i) Within <strong>the</strong> District - Rs.400/- per day per Coonoor No. 50<br />

farmer for 5 days excluding tranport.<br />

Kotagiri No. 50<br />

Gudalur No. 50<br />

b Within <strong>the</strong> State Udhagai No. 10<br />

c Outside <strong>the</strong> State Udhagai No. 2<br />

2 Exposure visit to Farmers<br />

a Within <strong>the</strong> State Udhagai No. 10<br />

Coonoor No. 5<br />

Kotagiri No. 5<br />

Gudalur No. 5<br />

b Outside <strong>the</strong> state Udhagai No. 2<br />

3<br />

Training /Study tour of technical staff/field<br />

functionaries<br />

a Within <strong>the</strong> state - 2 days Udhagai No. 100<br />

b Outside <strong>the</strong> state - 7 days Udhagai No. 25<br />

TOTAL 177.5 132.440

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!