national horticulture mission 2012 -2013 the nilgiris
national horticulture mission 2012 -2013 the nilgiris
national horticulture mission 2012 -2013 the nilgiris
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
I Production of Planting Materials<br />
1 Public Sector :<br />
NATIONAL HORTICULTURE MISSION <strong>2012</strong> -<strong>2013</strong> THE NILGIRIS<br />
Schemes implemented in Nilgiris during <strong>2012</strong> - <strong>2013</strong><br />
S.No Name of <strong>the</strong> Component Block Unit<br />
PHYSICAL<br />
In HA / No<br />
FINANCIAL<br />
In Lakhs<br />
Vegetable Seed Production @Rs.0.500 Lakhs<br />
/Ha<br />
2 Private Sector :<br />
Udhagai Ha 40 20.00<br />
Small Nursery (1 Ha) @ Rs.3.125 lakhs/Ha Udhagai No. 2 6.25<br />
II<br />
Establishment of New Garden/Area<br />
Expansion<br />
Spices : (For a maximum of 4.00 ha per<br />
beneficiary)<br />
1 Ginger:<br />
Rs.25000/= per ha Maximum of Rs.12500/= per<br />
Ha (50% cost of meeting <strong>the</strong> expenditure on<br />
planting materials and cost of materials for<br />
INM/IPM etc)<br />
2 Clove and Nutmeg :<br />
Rs.40000/= per ha Maximum of Rs.20000/= per<br />
Ha (50% cost of meeting <strong>the</strong> expenditure on<br />
planting materials and cost of materials for<br />
INM/IPM etc)<br />
3 Black Pepper :<br />
Rs.40000/= per ha Maximum of Rs.20000/= per<br />
Ha (50% cost of meeting <strong>the</strong> expenditure on<br />
planting materials and cost of materials for<br />
INM/IPM etc)<br />
Gudalur Ha 100 12.50<br />
Gudalur Ha 20 4.00<br />
Gudalur Ha 15 3.00<br />
III<br />
Protected Cultivation (Area in Ha.)<br />
Naturally ventilated System -Tubular Structure @<br />
4000 sq.mt./beneficiary Rs.650/= per sq.mt.<br />
50% of cost i.e Rs 325/= per sq.mt.<br />
Udhagai Sq.mt 9000 29.25<br />
Coonoor Sq.mt 8000 26.00<br />
Kotagiri Sq.mt 8000 26.00<br />
IV Organic Farming :<br />
1 Vermi compost units (permanent structure)<br />
Rs.60,000/- per unit - 50% of cost conforming to<br />
<strong>the</strong> size of <strong>the</strong> unit of 30'x8'x2.5' dimension of<br />
permanent structure to be administrated on pro -<br />
rata basis.ie.Rs.30,000/- per unit<br />
Udhagai No. 2 0.600<br />
Coonoor No. 1 0.300<br />
Kotagiri No. 1 0.300<br />
Gudalur No. 1 0.300
S.No<br />
Name of <strong>the</strong> Component<br />
Block Unit<br />
PHYSICAL FINANCIAL<br />
In HA / No In Lakhs<br />
2 Vermi compost units (HDPE Vermi bed)<br />
Udhagai No. 5 0.25<br />
Rs.10,000/- per unit - 50% of cost conforming to<br />
Coonoor No. 5 0.25<br />
<strong>the</strong> size of 96 cft (12'x4'x2') to be administrated<br />
on pro - rata basis.ie.Rs.5,000/- per unit Kotagiri No. 5 0.25<br />
Gudalur No. 5 0.25<br />
V Pollination Support through Bee keeping :<br />
1 Honey Bee Colonies Kotagiri No. 50 0.35<br />
Gudalur No. 50 0.35<br />
2 Bee Hives Kotagiri No. 50 0.40<br />
Gudalur No. 50 0.40<br />
3 Equipment Kotagiri No. 2 0.153<br />
Gudalur No. 1 0.077<br />
VI Horticulture Mechanisation :<br />
Udhagai No. 3 0.525<br />
Power operated machines /Tools<br />
Coonoor No. 3 0.525<br />
Kotagiri No. 2 0.35<br />
Gudalur No. 2 0.35<br />
VII Human Resource Development (HRD)<br />
1. a (c)Training of farmers<br />
Udhagai No. 100<br />
(i) Within <strong>the</strong> District - Rs.400/- per day per Coonoor No. 50<br />
farmer for 5 days excluding tranport.<br />
Kotagiri No. 50<br />
Gudalur No. 50<br />
b Within <strong>the</strong> State Udhagai No. 10<br />
c Outside <strong>the</strong> State Udhagai No. 2<br />
2 Exposure visit to Farmers<br />
a Within <strong>the</strong> State Udhagai No. 10<br />
Coonoor No. 5<br />
Kotagiri No. 5<br />
Gudalur No. 5<br />
b Outside <strong>the</strong> state Udhagai No. 2<br />
3<br />
Training /Study tour of technical staff/field<br />
functionaries<br />
a Within <strong>the</strong> state - 2 days Udhagai No. 100<br />
b Outside <strong>the</strong> state - 7 days Udhagai No. 25<br />
TOTAL 177.5 132.440