| 10/15/2007<br />

CLASSIC COMFORT<br />

“Merging the past with the present”<br />

MILESTONES<br />

A milestone is a terminal event that marks the completion of a work package or phase. It helps<br />

signify key events in a project and also may indicate direction of travel since key decisions made at<br />

milestones may alter the route through the project plan. Throughout the lifetime of our project, there<br />

will be significant events that will be used to report the project progress. These milestones will be used<br />

by the project stakeholders to identify the completion of the tasks. Milestones will also be used by<br />

Rhyvle Technologies to identify readiness to begin a new phase or group of tasks.<br />

Completion of Research<br />

Research will be conducted for each component involved in the Classic Comport project.<br />

Completion and Approval of Hardware Design<br />

Layout of hardware components and connections will be completed and presented to the<br />

project advisor for approval.<br />

Completion and Approval of Software Design<br />

Flow chart developed by the software engineer will be presented to the project advisor. The<br />

flow chart will be assessed by the advisor.<br />

Completion of Proto-board Mock-up<br />

A working proto-board mock-up of the system will be completed which will allow for testing to<br />

be done.<br />

Acceptance of PCB Design<br />

A PCB layout will be designed and sent out to be manufactured for the final prototype.<br />

Completion and Approval of Test Plan<br />

Documentation of how individual components as well as the overall system testing will be<br />

presented to the advisor for approval.<br />

Completion and Acceptance of Final Documentation<br />

The documentation will include any and all documented work, charts, graphs, schematics, etc.<br />

required throughout the entire process of our product.<br />

Completion and Acceptance of Prototype<br />

A working prototype will be demonstrated and delivered to our stakeholders and assessed to<br />

ensure the performance of required specification.<br />

8