Common Law Allocation - Ngwaketse Land Board

Common Law Allocation - Ngwaketse Land Board

Common Law Allocation - Ngwaketse Land Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Processing of APPLICATION FOR COMMON LAW<br />

LAND GRANT (NON-ADVERTISED) – (RE<br />

ENGINEERED PROCESS )<br />

START<br />

Submission of<br />

Application<br />

And filing<br />

2 mins<br />

Registry<br />

Management Team<br />

(SLB)<br />

1<br />

Kgotla<br />

Preparation for<br />

23 Days 21 Days 2 hrs<br />

<strong>Board</strong> Meeting<br />

and invitation<br />

Interviews<br />

7<br />

1 day (per<br />

5 mins<br />

Application)<br />

Site<br />

Site Visit<br />

15 mins<br />

2 days<br />

Sub <strong>Land</strong> <strong>Board</strong><br />

Compilation of<br />

Recommendation<br />

Report to<br />

Main <strong>Land</strong> <strong>Board</strong> (5 days)<br />

Registry MLB<br />

7 days<br />

2<br />

If approved<br />

5 days<br />

Lease Office<br />

Preparation<br />

of lease<br />

5 mins<br />

Appeals<br />

1 min<br />

Typing Pool<br />

3<br />

Typing of lease<br />

2 mins<br />

4 days<br />

Signing of lease<br />

Sorting of<br />

Applications<br />

5 mins<br />

<strong>Board</strong> Secretary/<strong>Board</strong> Chairman<br />

5 mins<br />

2 hours<br />

4 5<br />

5 mins<br />

MLB Chamber<br />

Lease Office<br />

Notification to collect<br />

lease<br />

5 mins 2 mins<br />

Presentation of<br />

recommendations to<br />

Main <strong>Land</strong> <strong>Board</strong><br />

1 day<br />

If rejected<br />

1 month<br />

6<br />

Communicate<br />

<strong>Board</strong> Resolution<br />

5 mins<br />

END<br />

END


ISSUES<br />

1. Preparations for <strong>Board</strong> meeting was 7 days because<br />

it included all applications.<br />

RECOMMENDATIONS<br />

1. To take a day because it will be per application.<br />

2. Time between sorting of applications and<br />

preparation of leases was 14 days.<br />

3. Typing of lease was 5 minutes.<br />

4. Time between typing of lease and signing of lease<br />

was 7 days because the <strong>Board</strong> Chairman came on<br />

weekly basis.<br />

5. Time between signing of lease and notification of<br />

lease collection was 5 hours.<br />

6. Time between <strong>Board</strong> resolution and communication<br />

of rejected applications was 2 months.<br />

2. Time reduced from 14 days to 5 days to speed up<br />

process.<br />

3. Time reduced from 5 minutes to 2 minutes to speed<br />

up process.<br />

4. Time reduced to 4 days because the Chairman and<br />

Vice Chairperson will alternate to increase the<br />

frequency to twice weekly.<br />

5. Time reduced to 2 hours due to the frequency of the<br />

signing of lease.<br />

6. Time reduced to 1 month because <strong>Board</strong> Secretary<br />

and Chairperson will confirm the resolution prior to<br />

confirmation of minutes.


Processing of APPLICATION FOR COMMON LAW<br />

LAND GRANT (NON-ADVERTISED) - RE<br />

ENGINEERED PROCESS (AS-IS)<br />

START<br />

Submission of<br />

Application<br />

And filing<br />

2 mins<br />

Registry<br />

23 Days<br />

Management Team<br />

(SLB)<br />

Preparation for<br />

<strong>Board</strong> Meeting<br />

and invitation<br />

7 days<br />

Kgotla<br />

21 Days 2 hrs<br />

Interviews<br />

7<br />

5 mins<br />

Site<br />

Site Visit<br />

15 mins<br />

2 days<br />

<strong>Board</strong> Clerk<br />

Compilation of<br />

Recommendation<br />

Report to<br />

Main <strong>Land</strong> <strong>Board</strong> (5 days)<br />

Registry MLB<br />

7 days<br />

Lease Office<br />

Preparation<br />

Typing Pool<br />

Sorting of<br />

Applications<br />

5 mins<br />

<strong>Board</strong> Secretary/<strong>Board</strong> Chairman<br />

5 mins<br />

<strong>Board</strong> Clerk<br />

Lease Office<br />

Presentation of<br />

recommendations to<br />

Main <strong>Land</strong> <strong>Board</strong><br />

1 day<br />

If approved<br />

14 days<br />

1<br />

of lease<br />

5 mins<br />

Appeals<br />

1 min<br />

Typing of lease<br />

5 mins<br />

7 days<br />

Signing of lease<br />

5 mins<br />

5 hours<br />

Notification to collect<br />

lease<br />

5 mins 2 mins<br />

If rejected<br />

2 months<br />

Communicate<br />

<strong>Board</strong> Resolution<br />

5 mins<br />

END<br />

END<br />

Registry


MEASUREMENTS – PROCESSING OF APPLICATION FOR COMMON LAW (NON-ADVERTISED)<br />

AS IS<br />

Re engineered<br />

Throughput Time: Approved:87 days 7 hours 52 mins<br />

69 days 4 hours 50 mins<br />

Rejected: 126 days 2 hrs 37 mins<br />

90 days 2hours 37 mins<br />

Value Adding Time: Approved: 13 days 47 mins<br />

7 days 44 minutes<br />

Rejected: 13 days 32 mins<br />

7 days 32 minutes<br />

Value Adding Ratio: Approved: 0.149 0.102<br />

Rejected: 0.103 0.078<br />

Productivity Rate: Approved: 14.9% 10.2%<br />

Rejected: 10.3% 7.8%


Process Improvement Recommendations<br />

Wasteful Activity<br />

Location<br />

Recommendation<br />

How<br />

When<br />

1. Inconsistency and Opportunity lost: There are<br />

three enquiry points – Registry Typing Pool and<br />

Technical Officers. This does not assist customers in<br />

any way but rather causes confusion as to which<br />

advice to take.<br />

Sub <strong>Land</strong><br />

<strong>Board</strong> Typing<br />

Pool, Registry<br />

and Technical<br />

Office<br />

Eliminate<br />

inconsistencies<br />

and opportunity<br />

lost<br />

The Sub <strong>Land</strong> <strong>Board</strong> to establish a Front Desk<br />

Short term<br />

1. Inconsistencies: Questions asked during interview<br />

are not relevant to land allocation but more of personal<br />

preferences by the interviewers. This causes delays<br />

and makes the client uncomfortable.<br />

Sub <strong>Land</strong><br />

<strong>Board</strong><br />

Eliminate<br />

inconsistencies<br />

Questions asked should be focused and<br />

specific to the client’s request to speed up the<br />

interview<br />

Immediate<br />

2. No Records: Applications are not recorded in a<br />

register when received to show date of submission and<br />

there is no proper filing of these. Forms get lost or<br />

miss from files<br />

Sub <strong>Land</strong><br />

<strong>Board</strong><br />

Build on Proper<br />

records<br />

A Manual register to be kept and all received<br />

applications recorded<br />

Immediate<br />

3. Rework: applications are not given permanent<br />

reference numbers when received but instead, they are<br />

given same numbers in different volumes.. Later<br />

applications are sorted and then given permanent<br />

reference numbers, creating unnecessary rework.<br />

Sub <strong>Land</strong><br />

<strong>Board</strong><br />

Eliminate rework<br />

Applications to be given reference numbers on<br />

receipt and referenced accordingly.<br />

The customer should be informed of the<br />

reference number when submitting the<br />

application.<br />

Immediate<br />

3.Rework: The chairman is included in the sorting of<br />

applications whilst there is a scheduled briefing for him<br />

after completing all preparation for meeting<br />

Sub <strong>Land</strong><br />

<strong>Board</strong><br />

Eliminate rework<br />

The chairman should not be involved in the<br />

sorting of applications but just briefed at the<br />

scheduled meeting.<br />

Immediate<br />

4,Delay: Invitations for interviews are separated from<br />

preparations for <strong>Board</strong> meeting.<br />

Sub <strong>Land</strong><br />

<strong>Board</strong><br />

Eliminate Delay<br />

Invitations for interviews should be done at the<br />

same with <strong>Board</strong> meeting preparation.<br />

Immediate<br />

4.Delay: Applicants interviewed at site without public<br />

participation and general advises from the <strong>Board</strong>.<br />

Sub <strong>Land</strong><br />

<strong>Board</strong><br />

Reduce delay<br />

Interviews should be done at the Kgotla for<br />

public participation.<br />

Immediate<br />

4. Delay: Technical Officers accompany the board<br />

committee on allocations visits to make sketch plans.<br />

This causes delay as these would be made available<br />

much later.<br />

Sub <strong>Land</strong><br />

<strong>Board</strong><br />

Eliminate delay<br />

Technical Officers to produce sketch plans<br />

during in preparation for meetings to reduce<br />

the delay and opportunity lost by the customer<br />

who ends up not allocated if the affected piece<br />

of land has not properly assessed.<br />

Short term<br />

/Immediate<br />

4. Delay: Sub <strong>Land</strong> <strong>Board</strong> takes more than three<br />

months to prepare recommendation report to Main<br />

<strong>Land</strong> <strong>Board</strong> and this causes further delay in allocating<br />

land to customers<br />

Sub <strong>Land</strong><br />

<strong>Board</strong><br />

Reduce delay<br />

Recommendation report to be prepared within<br />

two weeks after allocation and submitted to<br />

Main <strong>Land</strong> <strong>Board</strong> another two weeks before<br />

the sitting so that it is read and understood<br />

before the sitting.<br />

Short Term