Draft Basic Assessment Report.pdf - Zitholele.co.za
Draft Basic Assessment Report.pdf - Zitholele.co.za Draft Basic Assessment Report.pdf - Zitholele.co.za
BASIC ASSESSMENT REPORT Appendix B: Photographs – Site and PP View of the bottom part of Unit 4 Top part of Unit 4 View north of the site with Units 5-6 on the right and the boiler room on the left View to the south with Units 1-4 on the left and the boiler room on the right View east looking at a small workshop, concrete slab and Units 4 and 5 either side View west onto the boiler room View southwest also looking onto the Unit 4 boiler room. View northwest looking onto the Unit 5 boiler room and fan View northeast looking onto the Unit 5 hoppers View southeast looking at Unit 3 View of the existing blower fans that will be upgraded as part of the retrofit – note existing concrete slab and infrastructure. View of the ash collection system under the hoppers Area to be used for a boiler house as part of the retrofit – note existing concrete slab. Two stacks at Duvha power station, stack in foreground has 2 operational units using ESP technology – note visible emissions. Second stack has 3 operational unit all using FFP technology – note lack of visible emissions Area to be utilised for lay down area. 32
BASIC ASSESSMENT REPORT Site Notice on the R575 Local cafe (Mnandi cafe) were site notice was placed and BID’s distributed Site notice at the R575 Site notice at the main intersection between the power station road and the R575 Site notice at the dirt entrance road to the Eskom Village Closest stakeholders to consider – Eskom Village Stakeholders reading the site notice placed just outside the station entrance Site notice placed at the entrance to Golden Mile Estate Stakeholders reading the site notice placed at the entrance to the Golden Mile Estate Closest stakeholders to consider – Corobrik Closest stakeholders to consider – Eyethu Coal Closest stakeholders to consider – Entrance to Golden Mile Estate 33
- Page 1 and 2: July 2011 Draft Basic Assessment Ph
- Page 3 and 4: BASIC ASSESSMENT REPORT SECTION A:
- Page 5 and 6: BASIC ASSESSMENT REPORT Alternative
- Page 7 and 8: BASIC ASSESSMENT REPORT 7. SITE PHO
- Page 9 and 10: BASIC ASSESSMENT REPORT 11. WASTE,
- Page 11 and 12: BASIC ASSESSMENT REPORT Will the ac
- Page 13 and 14: BASIC ASSESSMENT REPORT Locality ma
- Page 15 and 16: BASIC ASSESSMENT REPORT Dam or rese
- Page 17 and 18: BASIC ASSESSMENT REPORT 2. CONTENT
- Page 19 and 20: BASIC ASSESSMENT REPORT SECTION D:
- Page 21 and 22: BASIC ASSESSMENT REPORT Preferred A
- Page 23 and 24: BASIC ASSESSMENT REPORT Indirect Im
- Page 25 and 26: BASIC ASSESSMENT REPORT Alternative
- Page 27 and 28: BASIC ASSESSMENT REPORT Direct Impa
- Page 29 and 30: BASIC ASSESSMENT REPORT SECTION E.
- Page 31: BASIC ASSESSMENT REPORT Appendix A:
- Page 35 and 36: BASIC ASSESSMENT REPORT Appendix D:
- Page 37 and 38: BASIC ASSESSMENT REPORT Air Quality
- Page 39 and 40: BASIC ASSESSMENT REPORT Appendix F:
BASIC ASSESSMENT REPORT<br />
Site Notice on the R575<br />
Local cafe (Mnandi cafe)<br />
were site notice was placed<br />
and BID’s distributed<br />
Site notice at the R575<br />
Site notice at the main<br />
intersection between the<br />
power station road and the<br />
R575<br />
Site notice at the dirt<br />
entrance road to the Eskom<br />
Village<br />
Closest stakeholders to<br />
<strong>co</strong>nsider – Eskom Village<br />
Stakeholders reading the<br />
site notice placed just<br />
outside the station entrance<br />
Site notice placed at the<br />
entrance to Golden Mile<br />
Estate<br />
Stakeholders reading the<br />
site notice placed at the<br />
entrance to the Golden Mile<br />
Estate<br />
Closest stakeholders to<br />
<strong>co</strong>nsider – Corobrik<br />
Closest stakeholders to<br />
<strong>co</strong>nsider – Eyethu Coal<br />
Closest stakeholders to<br />
<strong>co</strong>nsider – Entrance to<br />
Golden Mile Estate<br />
33