BASIC ASSESSMENT REPORT<br />
Appendix B: Photographs – Site and PP<br />
View of the bottom part of<br />
Unit 4<br />
Top part of Unit 4<br />
View north of the site with<br />
Units 5-6 on the right and<br />
the boiler room on the left<br />
View to the south with Units<br />
1-4 on the left and the boiler<br />
room on the right<br />
View east looking at a small<br />
workshop, <strong>co</strong>ncrete slab and<br />
Units 4 and 5 either side<br />
View west onto the boiler<br />
room<br />
View southwest also looking<br />
onto the Unit 4 boiler room.<br />
View northwest looking onto<br />
the Unit 5 boiler room and<br />
fan<br />
View northeast looking onto<br />
the Unit 5 hoppers<br />
View southeast looking at<br />
Unit 3<br />
View of the existing blower fans that will be upgraded as<br />
part of the retrofit – note existing <strong>co</strong>ncrete slab and<br />
infrastructure.<br />
View of the ash <strong>co</strong>llection<br />
system under the hoppers<br />
Area to be used for a boiler<br />
house as part of the retrofit<br />
– note existing <strong>co</strong>ncrete<br />
slab.<br />
Two stacks at Duvha power<br />
station, stack in foreground<br />
has 2 operational units<br />
using ESP technology –<br />
note visible emissions.<br />
Se<strong>co</strong>nd stack has 3<br />
operational unit all using<br />
FFP technology – note lack<br />
of visible emissions<br />
Area to be utilised for lay<br />
down area.<br />