10.01.2015 Views

Draft Basic Assessment Report.pdf - Zitholele.co.za

Draft Basic Assessment Report.pdf - Zitholele.co.za

Draft Basic Assessment Report.pdf - Zitholele.co.za

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BASIC ASSESSMENT REPORT<br />

SECTION E.<br />

RECOMMENDATION OF PRACTITIONER<br />

Is the information <strong>co</strong>ntained in this report and the documentation attached<br />

hereto sufficient to make a decision in respect of the activity applied for (in the<br />

view of the environmental assessment practitioner)<br />

YES<br />

NO<br />

If “NO”, indicate the aspects that should be assessed further as part of a S<strong>co</strong>ping and EIA process<br />

before a decision can be made (list the aspects that require further assessment):<br />

n/a<br />

If “YES”, please list any re<strong>co</strong>mmended <strong>co</strong>nditions, including mitigation measures that should be<br />

<strong>co</strong>nsidered for inclusion in any authorisation that may be granted by the <strong>co</strong>mpetent authority in respect<br />

of the application:<br />

It is re<strong>co</strong>mmended that the preferred technology (FFP) be approved for the proposed<br />

retrofit at Unit 4, using this ideal timeframe when the unit is not operational and no<br />

further stress will be placed on the power supply of the <strong>co</strong>untry.<br />

It is further re<strong>co</strong>mmended that the retrofit and operation of the Unit 4 FFP <strong>co</strong>nform to the<br />

EMP attached as well as any relevant existing Duvha Power Station procedures.<br />

Is an EMPr attached YES NO<br />

The EMPr must be attached as Appendix F.<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!