BASIC ASSESSMENT REPORT<br />
SECTION E.<br />
RECOMMENDATION OF PRACTITIONER<br />
Is the information <strong>co</strong>ntained in this report and the documentation attached<br />
hereto sufficient to make a decision in respect of the activity applied for (in the<br />
view of the environmental assessment practitioner)<br />
YES<br />
NO<br />
If “NO”, indicate the aspects that should be assessed further as part of a S<strong>co</strong>ping and EIA process<br />
before a decision can be made (list the aspects that require further assessment):<br />
n/a<br />
If “YES”, please list any re<strong>co</strong>mmended <strong>co</strong>nditions, including mitigation measures that should be<br />
<strong>co</strong>nsidered for inclusion in any authorisation that may be granted by the <strong>co</strong>mpetent authority in respect<br />
of the application:<br />
It is re<strong>co</strong>mmended that the preferred technology (FFP) be approved for the proposed<br />
retrofit at Unit 4, using this ideal timeframe when the unit is not operational and no<br />
further stress will be placed on the power supply of the <strong>co</strong>untry.<br />
It is further re<strong>co</strong>mmended that the retrofit and operation of the Unit 4 FFP <strong>co</strong>nform to the<br />
EMP attached as well as any relevant existing Duvha Power Station procedures.<br />
Is an EMPr attached YES NO<br />
The EMPr must be attached as Appendix F.<br />
29