BASIC ASSESSMENT REPORT<br />

Direct Impact<br />

Construction Noise<br />

Construction noise (i.e. grinding, welding, jack hammering, and<br />

materials handling) will impact on workers.<br />

Construction Dust<br />

Localised dust will be generated at the de<strong>co</strong>mmissioning site that<br />

may affect workers.<br />

Employment<br />

Upwards of 30 employment opportunities will be created as a<br />

result of the de<strong>co</strong>mmissioning of this project.<br />

Construction Waste<br />

Construction waste such as paints and thinners, metal off cuts,<br />

<strong>co</strong>ncrete spillage will be generated during the de<strong>co</strong>mmissioning of<br />

the FFP.<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 4 (low)<br />

Probability: 5 (will occur)<br />

Significance (SP): 35<br />

(MODERATE)<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 2 (minor)<br />

Probability: 5 (will occur)<br />

Significance (SP): 25 (LOW)<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 4 (low positive)<br />

Probability: 3 (medium)<br />

Significance (SP): 21 (LOW)<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 4 (low)<br />

Probability: 5 (will occur)<br />

Significance (SP): 35<br />

(MODERATE)<br />

• Mitigate by wearing appropriate PPE as per the Duvha<br />

safety procedure and regulations as well as the OHS<br />

Act.<br />

• Demarcate the working area as a noisy area.<br />

• Mitigate by wearing appropriate PPE as per the Duvha<br />

safety procedure and regulations as well as the OHS<br />

Act.<br />

• Demarcate the working area as a dusty area.<br />

• Undertake dust suppression measures.<br />

• Maximise positive impact by ensuring that local<br />

<strong>co</strong>ntractors are used wherever possible.<br />

• Implement the Duvha Power Station Waste Policy and<br />

procedures<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 2 (minor)<br />

Probability: 3 (medium)<br />

Significance (SP): 15 (LOW)<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 2 (minor)<br />

Probability: 2 (low)<br />

Significance (SP): 10 (LOW)<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 4 (low positive)<br />

Probability: 4 (high)<br />

Significance (SP): 28 (LOW)<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 4 (low)<br />

Probability: 3 (moderate)<br />

Significance (SP): 21 (LOW)<br />

Indirect<br />

Impact<br />

There are not expected to be any indirect impacts generated during the de<strong>co</strong>mmissioning phase of the FFP.<br />

Cumulative<br />

Impact<br />

There are not expected to be any cumulative impacts generated during the de<strong>co</strong>mmissioning phase of the FFP.