BASIC ASSESSMENT REPORT<br />
Direct Impact<br />
Construction Noise<br />
Construction noise (i.e. grinding, welding, jack hammering, and<br />
materials handling) will impact on workers.<br />
Construction Dust<br />
Localised dust will be generated at the de<strong>co</strong>mmissioning site that<br />
may affect workers.<br />
Employment<br />
Upwards of 30 employment opportunities will be created as a<br />
result of the de<strong>co</strong>mmissioning of this project.<br />
Construction Waste<br />
Construction waste such as paints and thinners, metal off cuts,<br />
<strong>co</strong>ncrete spillage will be generated during the de<strong>co</strong>mmissioning of<br />
the FFP.<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 4 (low)<br />
Probability: 5 (will occur)<br />
Significance (SP): 35<br />
(MODERATE)<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 2 (minor)<br />
Probability: 5 (will occur)<br />
Significance (SP): 25 (LOW)<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 4 (low positive)<br />
Probability: 3 (medium)<br />
Significance (SP): 21 (LOW)<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 4 (low)<br />
Probability: 5 (will occur)<br />
Significance (SP): 35<br />
(MODERATE)<br />
• Mitigate by wearing appropriate PPE as per the Duvha<br />
safety procedure and regulations as well as the OHS<br />
Act.<br />
• Demarcate the working area as a noisy area.<br />
• Mitigate by wearing appropriate PPE as per the Duvha<br />
safety procedure and regulations as well as the OHS<br />
Act.<br />
• Demarcate the working area as a dusty area.<br />
• Undertake dust suppression measures.<br />
• Maximise positive impact by ensuring that local<br />
<strong>co</strong>ntractors are used wherever possible.<br />
• Implement the Duvha Power Station Waste Policy and<br />
procedures<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 2 (minor)<br />
Probability: 3 (medium)<br />
Significance (SP): 15 (LOW)<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 2 (minor)<br />
Probability: 2 (low)<br />
Significance (SP): 10 (LOW)<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 4 (low positive)<br />
Probability: 4 (high)<br />
Significance (SP): 28 (LOW)<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 4 (low)<br />
Probability: 3 (moderate)<br />
Significance (SP): 21 (LOW)<br />
Indirect<br />
Impact<br />
There are not expected to be any indirect impacts generated during the de<strong>co</strong>mmissioning phase of the FFP.<br />
Cumulative<br />
Impact<br />
There are not expected to be any cumulative impacts generated during the de<strong>co</strong>mmissioning phase of the FFP.