BASIC ASSESSMENT REPORT<br />

Alternative 2 (also No-Go Alternative): Electro-Static Precipitator<br />

Potential impacts:<br />

Significance rating of<br />

impacts:<br />

Proposed mitigation:<br />

Significance rating after<br />

mitigation:<br />

PLANNING AND DESIGN PHASE<br />

As this is the no-go alternative with all of the structures already in place on site, no planning or design will be required.<br />

Direct Impact<br />

Indirect Impact<br />

Cumulative<br />

Impact<br />

There will therefore be no impacts generated during this phase of the project.<br />

CONSTRUCTION PHASE<br />

All the infrastructure is already <strong>co</strong>nstructed on site and hence no impact will arise from this phase.<br />

Direct Impact<br />

Indirect Impact<br />

Cumulative Impact<br />

There will therefore be no impacts generated during this phase of the project.<br />

OPERATIONAL PHASE<br />

The operational phase of the ESP plant represents the current operating <strong>co</strong>nditions at Duvha Power Station. The ESP has an existing emissions limit of 75mg/Nm 3 for particulate emissions. In recent time reduction<br />

in <strong>co</strong>al quality and variation in the supply caused the ESP to struggle to <strong>co</strong>mply with this emissions limit. In order for the plant to reach this limit there was a very real risk of Unit 4 having to take load losses in order<br />

to stay within the limits.<br />

Direct Impact<br />

Ambient Noise<br />

Ambient noise levels will be affected by ID fans. Noise is also<br />

generated by the other Units (1-3, 5-6).<br />

Waste Generation<br />

No waste is directly generated by this activity<br />

Ash captured by the FFP is a ha<strong>za</strong>rdous waste stream. This is<br />

discussed under cumulative impacts below.<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 2 (minor)<br />

Probability: 1 (improbable)<br />

Significance (SP): 5 (LOW)<br />

No impact<br />

• Ensure that all machinery is in good working order and<br />

operating within the allowable limits for noise<br />

generation.<br />

• Ensure appropriate PPE is worn in all noisy areas.<br />

• Adhere to any plant specific procedures that govern<br />

noise.<br />

• Ensure that the ash is transported via the existing waste<br />

management system.<br />

• Ensure that any procedure relevant to the ash and<br />

waste management system is adhered to.<br />

Scale: 1 (site only)<br />

Duration: 2 (short term)<br />

Magnitude: 2 (minor)<br />

Probability: 1 (improbable)<br />

Significance (SP): 5 (LOW)<br />

No impact