BASIC ASSESSMENT REPORT<br />
Indirect Impact<br />
Cumulative<br />
Impact<br />
Waste Spillage<br />
Spillage <strong>co</strong>uld occur during the handling of waste (either tear in<br />
filter bags / or dust extracted by the plant).<br />
Air Quality<br />
The operation of the FFP will reduce the particulate emissions<br />
from the Unit 4 boiler by up to 99.99% <strong>co</strong>mpared to the 99.6% -<br />
99.8% from the ESP. This will ensure that particulate emissions<br />
emitted from the stack are less than 50mg/Nm 3 during normal<br />
operation, which is the minimum emission standard for new plant.<br />
This will eliminate the visible plume of dust currently visible from<br />
the stack (refer photographs).<br />
Employment<br />
This project will no create any additional permanent positions,<br />
however it is anticipated that every four years 100 general<br />
labourers will be employed for an estimated 5 weeks to assist with<br />
the replacement of the fabric filter bags in the FFP. There is also<br />
potential job creation at the bag production plant due to the extra<br />
bags required for this FFP.<br />
Impacts to Human, Plant and Animal Health<br />
The reduction of emissions from Unit 4 by 50% - >60% by using<br />
the FFP <strong>co</strong>mpared to ESP technology will improve the ambient air<br />
quality around the power station, and indirectly reduce the<br />
potential impact to human, animal and plant health by the<br />
emissions.<br />
Legal Compliance<br />
Upgrading Unit 4 with the FFP technology will allow the plant to<br />
operate within the current 75 mg/Nm 3 limit and also the future 50<br />
mg/Nm 3 limit. Thus ensuring long term legal <strong>co</strong>mpliance to air<br />
quality legislation.<br />
Air Quality<br />
Systematic improvements have occurred over the years as Duvha<br />
power station has been replacing the existing ESP technology<br />
with FFP technology. The positive cumulative impact is<br />
noticeable. In time (estimated in the year 2017-8) the remaining<br />
two Units 5 and 6 will also be replaced.<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 4 (low)<br />
Probability: 5 (will occur)<br />
Significance (SP): 35<br />
(MODERATE)<br />
Scale: 2 (local)<br />
Duration: 4 (long term)<br />
Magnitude: 2 (minor positive)<br />
Probability: 5 (will occur)<br />
Significance (SP): 40<br />
(MODERATE)<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 2 (minor positive)<br />
Probability: 4 (High)<br />
Significance (SP): 20 (LOW)<br />
Scale: 2 (local)<br />
Duration: 4 (long term)<br />
Magnitude: 2 (minor positive)<br />
Probability: 4 (high)<br />
Significance (SP): 40<br />
(MODERATE)<br />
Scale: 2 (local)<br />
Duration: 4 (long term)<br />
Magnitude: 2 (minor positive)<br />
Probability: 4 (high)<br />
Significance (SP): 40<br />
(MODERATE)<br />
Scale: 2 (local)<br />
Duration: 4 (long term)<br />
Magnitude: 2 (low positive)<br />
Probability: 4 (high)<br />
Significance (SP): 40<br />
(MODERATE)<br />
• Adhere to the FFP dusting procedures as well as the<br />
bag inspection and replacement procedure.<br />
• In terms of mitigation ensure that the FFP is operated<br />
ac<strong>co</strong>rding to the FFP operating procedure and ensure<br />
that all maintenance is <strong>co</strong>nducted in line with the<br />
existing procedures for maintenance.<br />
• Ensure that the minimum emission standards are met.<br />
• Enhance the positive impact by allowing for HDI<br />
individuals to be employed.<br />
• No mitigation measures required.<br />
• Ensure that the emissions from Duvha Power Station<br />
are within the allowable limit as per national legislation<br />
and site specific license <strong>co</strong>nditions.<br />
• Ensure that the current vision of <strong>co</strong>ntinual improvement<br />
at the station is reached by keeping the retrofit of Units 5<br />
and 6 in the long term planning of the station.<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 2 (minor)<br />
Probability: 5 (will occur)<br />
Significance (SP): 25 (LOW)<br />
Scale: 2 (local)<br />
Duration: 4 (long term)<br />
Magnitude: 2 (minor positive)<br />
Probability: 5 (will occur)<br />
Significance (SP): 40<br />
(MODERATE)<br />
Scale: 1 (site only)<br />
Duration: 2 (short term)<br />
Magnitude: 2 (minor positive)<br />
Probability: 5 (will occur)<br />
Significance (SP): 25(LOW)<br />
Scale: 2 (local)<br />
Duration: 4 (long term)<br />
Magnitude: 2 (minor positive)<br />
Probability: 4 (high)<br />
Significance (SP): 40<br />
(MODERATE)<br />
Scale: 2 (local)<br />
Duration: 4 (long term)<br />
Magnitude: 2 (minor positive)<br />
Probability: 4 (high)<br />
Significance (SP): 40<br />
(MODERATE)<br />
Scale: 2 (local)<br />
Duration: 4 (long term)<br />
Magnitude: 2 (low positive)<br />
Probability: 4 (high)<br />
Significance (SP): 40<br />
(MODERATE)