BASIC ASSESSMENT REPORT<br />
If yes, inform the <strong>co</strong>mpetent authority and request a change to an application for s<strong>co</strong>ping and<br />
EIA.<br />
The disposal of the FFP bags is an existing authorised activity at Duvha Power Station<br />
and no further authorisation is required.<br />
Is the activity that is being applied for a solid waste handling or treatment YES NO<br />
facility<br />
If yes, then the applicant should <strong>co</strong>nsult with the <strong>co</strong>mpetent authority to determine whether it is<br />
necessary to change to an application for s<strong>co</strong>ping and EIA.<br />
11(b)<br />
Liquid effluent<br />
Will the activity produce effluent, other than normal sewage, that will be YES NO<br />
disposed of in a municipal sewage system<br />
If yes, what estimated quantity will be produced per month m 3<br />
Will the activity produce any effluent that will be treated and/or disposed of on Yes NO<br />
site<br />
If yes, the applicant should <strong>co</strong>nsult with the <strong>co</strong>mpetent authority to determine whether it is<br />
necessary to change to an application for s<strong>co</strong>ping and EIA.<br />
Will the activity produce effluent that will be treated and/or disposed of at YES NO<br />
another facility<br />
If yes, provide the particulars of the facility:<br />
Facility name: n/a<br />
Contact<br />
person:<br />
Postal<br />
address:<br />
Postal <strong>co</strong>de:<br />
Telephone:<br />
Cell:<br />
E-mail:<br />
Fax:<br />
Describe the measures that will be taken to ensure the optimal reuse or recycling of waste<br />
water, if any:<br />
The disposal facility is a dry facility and does not utilise water.<br />
11(c)<br />
Emissions into the atmosphere<br />
Will the activity release emissions into the atmosphere YES NO<br />
If yes, is it <strong>co</strong>ntrolled by any legislation of any sphere of government YES NO<br />
If yes, the applicant should <strong>co</strong>nsult with the <strong>co</strong>mpetent authority to determine<br />
whether it is necessary to change to an application for s<strong>co</strong>ping and EIA.<br />
Not required as the activity is already licensed (application is triggered by the<br />
amendment of the existing permit/license). Furthermore, the air quality authorities are<br />
being <strong>co</strong>nsulted for amendment of the existing permit.<br />
If no, describe the emissions in terms of type and <strong>co</strong>ncentration:<br />
n/a as this proposed retrofit activity will reduce emissions of Particulate Matter. The<br />
activity is Eskom’s response strategy to ensuring plant/unit <strong>co</strong>mpliance with the<br />
Minimum authorised Emission Standards published in April 2010 and <strong>co</strong>ming into effect<br />
in 2020.<br />
11(d)<br />
Generation of noise