BASIC ASSESSMENT REPORT<br />

If yes, inform the <strong>co</strong>mpetent authority and request a change to an application for s<strong>co</strong>ping and<br />

EIA.<br />

The disposal of the FFP bags is an existing authorised activity at Duvha Power Station<br />

and no further authorisation is required.<br />

Is the activity that is being applied for a solid waste handling or treatment YES NO<br />

facility<br />

If yes, then the applicant should <strong>co</strong>nsult with the <strong>co</strong>mpetent authority to determine whether it is<br />

necessary to change to an application for s<strong>co</strong>ping and EIA.<br />

11(b)<br />

Liquid effluent<br />

Will the activity produce effluent, other than normal sewage, that will be YES NO<br />

disposed of in a municipal sewage system<br />

If yes, what estimated quantity will be produced per month m 3<br />

Will the activity produce any effluent that will be treated and/or disposed of on Yes NO<br />

site<br />

If yes, the applicant should <strong>co</strong>nsult with the <strong>co</strong>mpetent authority to determine whether it is<br />

necessary to change to an application for s<strong>co</strong>ping and EIA.<br />

Will the activity produce effluent that will be treated and/or disposed of at YES NO<br />

another facility<br />

If yes, provide the particulars of the facility:<br />

Facility name: n/a<br />

Contact<br />

person:<br />

Postal<br />

address:<br />

Postal <strong>co</strong>de:<br />

Telephone:<br />

Cell:<br />

E-mail:<br />

Fax:<br />

Describe the measures that will be taken to ensure the optimal reuse or recycling of waste<br />

water, if any:<br />

The disposal facility is a dry facility and does not utilise water.<br />

11(c)<br />

Emissions into the atmosphere<br />

Will the activity release emissions into the atmosphere YES NO<br />

If yes, is it <strong>co</strong>ntrolled by any legislation of any sphere of government YES NO<br />

If yes, the applicant should <strong>co</strong>nsult with the <strong>co</strong>mpetent authority to determine<br />

whether it is necessary to change to an application for s<strong>co</strong>ping and EIA.<br />

Not required as the activity is already licensed (application is triggered by the<br />

amendment of the existing permit/license). Furthermore, the air quality authorities are<br />

being <strong>co</strong>nsulted for amendment of the existing permit.<br />

If no, describe the emissions in terms of type and <strong>co</strong>ncentration:<br />

n/a as this proposed retrofit activity will reduce emissions of Particulate Matter. The<br />

activity is Eskom’s response strategy to ensuring plant/unit <strong>co</strong>mpliance with the<br />

Minimum authorised Emission Standards published in April 2010 and <strong>co</strong>ming into effect<br />

in 2020.<br />

11(d)<br />

Generation of noise