10.01.2015 Views

Lafarge Ravena Contractor Orientation Questions with Key April 26 ...

Lafarge Ravena Contractor Orientation Questions with Key April 26 ...

Lafarge Ravena Contractor Orientation Questions with Key April 26 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Contractor</strong> <strong>Orientation</strong><br />

Evaluation<br />

15) If a train is at the crossing, it is ok to back out onto Route 9W.<br />

a. true<br />

b. false<br />

16) If a guard is missing on equipment you need to operate, __________.<br />

a. operate it <strong>with</strong> caution<br />

b. do not operate it<br />

17) When rigging, it is best to use wire rope rather than nylon rope.<br />

a. true<br />

b. false<br />

18) It is safe to use any compressed air to blow down your clothing.<br />

a. true<br />

b. false<br />

19) If an area is taped off <strong>with</strong> red tape ______________.<br />

a. do not enter the area unless you are authorized to<br />

b. it may be entered as long as you check the surrounding area first<br />

20) Scaffolding in regular use must be inspected __________.<br />

a. before use each day<br />

b. each week<br />

c. monthly<br />

21) <strong>Contractor</strong> locks are to be marked <strong>with</strong> ____________.<br />

a. your name<br />

b. your home phone number<br />

c. your company name<br />

4/<strong>26</strong>/2010 <strong>Ravena</strong> Page 3 of 6<br />

Prepared by:<br />

training solutions ltd.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!