<strong>Contractor</strong> <strong>Orientation</strong><br />

Evaluation<br />

1) Field Level Risk Assessment forms must be filled out __________.<br />

a. each day you are on site<br />

b. at the start of a specific project only<br />

c. anytime you notice a hazard<br />

2) Before working in the plant, you need to sign in __________.<br />

a. at the main office building<br />

b. only if you will be on site all day<br />

3) Once you have signed in at one area, you don’t need to sign in at others such as the<br />

quarry.<br />

a. true<br />

b. false<br />

4) The first aid station is located __________.<br />

a. near Stores<br />

b. in the main building<br />

5) An incident needs to be reported only when an injury has occurred.<br />

a. false<br />

b. true<br />

6) The gaitronics phones connect directly to __________.<br />

a. the control room<br />

b. first aid<br />

7) After using an extinguisher, __________.<br />

a. return it to Stores for re-charging<br />

b. leave it at the scene of the fire<br />

c. put it back where you found it<br />

4/<strong>26</strong>/2010 <strong>Ravena</strong> Page 1 of 6<br />

Prepared by:<br />

training solutions ltd.


<strong>Contractor</strong> <strong>Orientation</strong><br />

Evaluation<br />

8) High visibility apparel is required in __________.<br />

a. all areas<br />

b. designated areas only<br />

c. high traffic areas only<br />

9) A full-body harness is required when working __________.<br />

a. only at heights of 10' or greater<br />

b. at any height where there is a risk of injury in the event of a fall<br />

10) A life jacket is required if you are working __________.<br />

a. on a barge<br />

b. <strong>with</strong>in 6' of the water<br />

c. <strong>with</strong>in 12' of the water<br />

11) <strong>Contractor</strong>s are permitted to park or drive their vehicles anywhere on site as long as it<br />

is near their work area.<br />

a. false<br />

b. true<br />

12) <strong>Contractor</strong> vehicles parked in the parking lot must have a tag displayed.<br />

a. true<br />

b. false<br />

13) The speed limit in the plant areas is __________.<br />

a. 25 mph<br />

b. 15 mph<br />

c. 10 mph<br />

14) Seat belt use is mandatory for any vehicle on site.<br />

a. true<br />

b. false<br />

4/<strong>26</strong>/2010 <strong>Ravena</strong> Page 2 of 6<br />

Prepared by:<br />

training solutions ltd.


<strong>Contractor</strong> <strong>Orientation</strong><br />

Evaluation<br />

15) If a train is at the crossing, it is ok to back out onto Route 9W.<br />

a. true<br />

b. false<br />

16) If a guard is missing on equipment you need to operate, __________.<br />

a. operate it <strong>with</strong> caution<br />

b. do not operate it<br />

17) When rigging, it is best to use wire rope rather than nylon rope.<br />

a. true<br />

b. false<br />

18) It is safe to use any compressed air to blow down your clothing.<br />

a. true<br />

b. false<br />

19) If an area is taped off <strong>with</strong> red tape ______________.<br />

a. do not enter the area unless you are authorized to<br />

b. it may be entered as long as you check the surrounding area first<br />

20) Scaffolding in regular use must be inspected __________.<br />

a. before use each day<br />

b. each week<br />

c. monthly<br />

21) <strong>Contractor</strong> locks are to be marked <strong>with</strong> ____________.<br />

a. your name<br />

b. your home phone number<br />

c. your company name<br />

4/<strong>26</strong>/2010 <strong>Ravena</strong> Page 3 of 6<br />

Prepared by:<br />

training solutions ltd.


<strong>Contractor</strong> <strong>Orientation</strong><br />

Evaluation<br />

22) How many different types of lock-out procedures are used at our site<br />

a. 1<br />

b. 2<br />

c. 3<br />

23) When locking out, are contractors allowed to pull disconnects<br />

a. no<br />

b. yes<br />

24) If an electrical contractor needs to operate equipment identified as a potential arc<br />

flash hazard, __________.<br />

a. proof of training must be supplied<br />

b. the work must be directly supervised by a qualified <strong>Lafarge</strong> supervisor<br />

25) The confined space attendant’s responsibility is to __________.<br />

a. assist you by handing you tools<br />

b. record who is entering and exiting<br />

c. monitor the atmosphere<br />

d. give you repair instructions<br />

<strong>26</strong>) Hazcom training includes ____________.<br />

a. understanding container labels<br />

b. locating MSDS information<br />

c. labelling requirements for secondary containers<br />

d. selecting the most useful chemical for the task<br />

27) MSDS for products at this site are available __________.<br />

a. in hard copy in binders<br />

b. on-line<br />

c. from your <strong>Lafarge</strong> contact<br />

28) MARSEC Security Level 1 is __________.<br />

a. the lowest security level<br />

b. the highest security level<br />

4/<strong>26</strong>/2010 <strong>Ravena</strong> Page 4 of 6<br />

Prepared by:<br />

training solutions ltd.


<strong>Contractor</strong> <strong>Orientation</strong><br />

Evaluation<br />

29) <strong>Contractor</strong>s are required to comply <strong>with</strong> all applicable environmental regulations and<br />

procedures.<br />

a. true<br />

b. false<br />

30) An oil spill must be contained and cleaned up __________.<br />

a. <strong>with</strong>in 30 minutes<br />

b. <strong>with</strong>in 1 hour<br />

c. <strong>with</strong>in 2 hours<br />

4/<strong>26</strong>/2010 <strong>Ravena</strong> Page 5 of 6<br />

Prepared by:<br />

training solutions ltd.


<strong>Contractor</strong> <strong>Orientation</strong><br />

Evaluation<br />

Evaluation <strong>Key</strong><br />

1) a<br />

2) a<br />

3) b<br />

4) b<br />

5) a<br />

6) a<br />

7) a<br />

8) a<br />

9) b<br />

10) a b<br />

11) a<br />

12) a<br />

13) b<br />

14) a<br />

15) b<br />

16) b<br />

17) a<br />

18) b<br />

19) a<br />

20) a<br />

21) a b c<br />

22) b<br />

23) a<br />

24) a b<br />

25) b c<br />

<strong>26</strong>) a b c<br />

27) a b<br />

28) a<br />

29) a<br />

30) c<br />

4/<strong>26</strong>/2010 <strong>Ravena</strong> Page 6 of 6<br />

Prepared by:<br />

training solutions ltd.