10.01.2015 Views

CORRIGENDUM No. 2 - Yap State Government

CORRIGENDUM No. 2 - Yap State Government

CORRIGENDUM No. 2 - Yap State Government

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Response:<br />

The tender dossier requires that EU “Tender Guarantee Form” format must be used and submitted with the<br />

tender proposal<br />

(oo). Clarification Request #41:<br />

“Continuous Power at 25°C minimum 300W – maximum 400W”<br />

We can offer an Inverter with this value expressed in [VA] instead of [W]. Due to the missing data on<br />

number and type of devices that will be loaded by the grid-off plants, we cannot give the value for<br />

Continuous power expressed in [W]. Would you please be so kind to tell us if the range of Continuous<br />

power of 650-800 [VA] will be good as well.<br />

Exactly the same thing we would like to know regarding the technical specification for SCS plants as<br />

follows:<br />

“Continuous Power at 25°C minimum 3000W – max.3500W”<br />

Our proposal for the Continuous power is 5000 [VA] .Could it be suitable for SCS needs<br />

Response:<br />

It is acceptable to express the inverter values in “VA” as well as “W”. The ratings shall be within the<br />

guideline ranges as noted in the specifications of Annex II f.1) and f.2). Each tenderer must conclude to the<br />

best of their knowledge the best practiced design and component/materials provision meeting the<br />

specified guidelines. The overall design and technical specifications will be given preference and systems<br />

with established histories of performance shall be preferred.<br />

(pp). Clarification Request #42:<br />

Equipment delivery must be carried out in kits, in a grouped format, or it can be delivered each of their<br />

components separately: panels, regulators, inverters, batteries and accessories.”<br />

Response:<br />

Reference to “Equipment Delivery in kits” is not found & therefore refer to Annex II document (Annex II -<br />

Specificationsv2_final) related to this components delivery question as to be “supplies are to be made in<br />

one lot and to be delivered….”<br />

(qq). Clarification Request #43:<br />

At point a.3) of technical specifications standard IEEE 1262 is required<br />

IEEE 1262 served its purpose as the first consensus qualification test standard for thin film modules but, in<br />

this tender, are silicon types. Therefore, the standard IEEE 1262 is not applicable.<br />

Response:<br />

This is a United <strong>State</strong>s informational standard basis for PV panels that tenderers shall refer to for<br />

establishing their proposal submissions and is for reference purposes. Any subsequent standard/s for PV<br />

module qualification guidelines that have replaced and/or succeeded prior recommended practices shall be<br />

the responsibility of the tenderer and shall be followed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!