(o). Clarification Request #15:<br />
REFERENCE IS MADE TO TECHNICAL SPECIFICATIONS ITEM 1.2 AND ITEM 2.2 (MOUNTING RAILS): Please<br />
clarify how the mounting rails should be done. Have they to be deemed for ground mounting or roof<br />
mounting In case of ground mounting please clarify if a steel or aluminium pole must be supplied.<br />
Response:<br />
The tender dossier states that the panels will be ground mounted – see Annex II-specifications b.2 and b.3.<br />
<strong>No</strong> poles need to be provided as the footing (poles) will be made of concrete and completed by YSPSC. The<br />
tenderer will have to send, however, their technical drawing of the mounting structure they propose. – see<br />
Annex II-specifications b.3.<br />
(p). Clarification Request #16:<br />
REFERENCE IS MADE TO TECHNICAL SPECIFICATIONS: Please clarify if the inverters and charge controller<br />
must be mounted on an electrical control board. If so should the supplier deliver them pre-mounted on<br />
the electrical board or the end users will take care of mounting Moreover, in case of electrical board are<br />
to be supplied which kind of electrical board do you need Which would be the IP protection number<br />
Response:<br />
The design of the PV system is up to the tenderer and the most appropriate design will be selected. Please<br />
note that we follow the technical guidelines for the pacific islands for the design, find attached a copy of<br />
these guidelines.<br />
(q). Clarification Request #17:<br />
REFERENCE IS MADE TO TECHNICAL SPECIFICATIONS<br />
Should the bidder supply earth grounding with earth rod<br />
Response:<br />
Yes, see technical guide and the NEC electrical code for off-grid PV installations.<br />
(r). Clarification Request #18:<br />
REFERENCE IS MADE TO THE TENDER SCOPE: Does the contract include installation or only delivery CIF In<br />
case the contract includes installation please send us the list of installation sites.<br />
Response:<br />
<strong>No</strong> installation is required under this tender.<br />
(s). Clarification Request #19:<br />
REFERENCE IS MADE TO INVERTERS QUANTITY: Please confirm that inverter quantities is 400 and -in any<br />
case - a 10% extra inverter must be included as spare parts<br />
Response:<br />
The requested quantity is 400 Sinewave inverters 24Vdc 120 Vac 60Hz 300W plus 10% spares and 20 Sine<br />
wave inverter 48Vdc 120Vac 60Hz 3000W plus 10% spares<br />
(t). Clarification Request #20:<br />
Rules of Origin: Clause 3 of Instructions to Tenderers.<br />
Please provide list of countries applicable for this project. Could you provide us with the copy of the<br />
Reference note of derogation # DEVCO/H3/BD/D (2011)<br />
Response:<br />
See the attached copy of the “Letter of Derogation”: