09.01.2015 Views

Download law text (English translation) - NEEC

Download law text (English translation) - NEEC

Download law text (English translation) - NEEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(5) management category of the new chemical substance.<br />

The registration certificate of a regular notification shall specify the risk control measures and<br />

administrative management requirements.<br />

Article 26 (Reporting and Handling of New Properties) When a holder of a registration certificate finds<br />

that the new chemical substance approved for registration has any new hazardous property, it shall<br />

immediately submit the new information on the hazardous property of such chemical substance to the<br />

Registration Center.<br />

The Registration Center shall submit the new information on hazardous property of the new chemical<br />

substance approved for registration to the review committee for technical review.<br />

The Ministry of Environmental Protection shall, on the basis of the technical review opinions of the<br />

review committee, take the following measures:<br />

(1) If the risks can be controlled through increasing the risk control measures, it shall supplement the<br />

relevant risk control measures in the registration certificate and request the holder of the registration<br />

certificate to implement the corresponding additional risk control measures; and<br />

(2) If appropriate risk control measures are not available for controlling the risks, it shall withdraw the<br />

registration certificate of the new chemical substance and make an announcement.<br />

Article 27 (Re-notification) Where a new chemical substance which is not yet listed in the Directory of<br />

Existing Chemical Substances in China and has been approved for registration falls under any of the<br />

following circumstances, the holder of the registration certificate shall submit a notification anew<br />

according to the procedures prescribed in these Measures:<br />

(1) increasing the registered quantity grade; or

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!