09.01.2015 Views

Report and Accounts 1999 / 2000 - Carlsberg Group

Report and Accounts 1999 / 2000 - Carlsberg Group

Report and Accounts 1999 / 2000 - Carlsberg Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The New <strong>Carlsberg</strong> A/S<br />

53<br />

<strong>Carlsberg</strong> Research Center<br />

The main task of the laboratory is to provide a<br />

scientific basis for malting, brewing <strong>and</strong> fermenting<br />

operations, which is as complete as possible.<br />

The laboratory is currently involved in:<br />

· investigation of grain species applicable for<br />

brewing through chemical, biochemical,<br />

physiological, genetic <strong>and</strong> gene technological<br />

methods;<br />

· investigation of genetic conditions <strong>and</strong> other<br />

conditions for yeast;<br />

· investigation of the substances in the grain<br />

species, especially proteins <strong>and</strong> carbohydrates,<br />

<strong>and</strong> the reaction <strong>and</strong> conversion of these<br />

substances during brewing operations.<br />

The <strong>Carlsberg</strong> Laboratory receives approx. DKK<br />

25 million from external sponsors for the implementation<br />

of research projects.<br />

At present, the <strong>Carlsberg</strong> Research Center is<br />

investigating how best to commercialise the<br />

biotechnological research results of the past<br />

decades in a possible future <strong>Carlsberg</strong> Bio-<br />

Incubator.<br />

<strong>Carlsberg</strong> Properties<br />

<strong>Carlsberg</strong> Properties h<strong>and</strong>les the <strong>Group</strong>’s property<br />

portfolio outside the actual production facilities, i.e.<br />

especially the development <strong>and</strong> building on the<br />

approx. 400,000 m 2 Tuborg area overlooking the<br />

sound between Denmark <strong>and</strong> Sweden in Hellerup,<br />

north of Copenhagen.<br />

At present, three major office buildings with a<br />

total floorage of 38,000 covering the domicile of<br />

among others NCC Danmark, Microsoft <strong>and</strong> icl<br />

invia are under construction at Tuborg Nord,<br />

which constitutes almost half of the large area.<br />

When these three major office buildings have<br />

been completed, the non-residential part, which<br />

covers about 80% of Tuborg Nord is completed.<br />

The remaining 20% of the Tuborg Nord area will<br />

be used for housing construction <strong>and</strong> the first<br />

phase with construction of 40 high-quality flats<br />

has started. The flats are sold as condominiums<br />

<strong>and</strong> since they have already been sold, the<br />

second phase with 46 high-quality flats has just<br />

been initiated. 75-100 flats still remain to be built<br />

before the entire Tuborg Nord area is completed.<br />

In co-operation with the city of Gentofte, a<br />

competition for ideas regarding the development<br />

of the area of Tuborg Syd was set up. The<br />

subsequent local district plan was finalised with<br />

the adoption by the local council of plan no. 178

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!