RFP for Resurvey project - ANAND & other SEVEN Districts <strong>of</strong> Gujarat State<br />
The Bidder (Prime Bidder in case <strong>of</strong> a consortium) should have had a minimum total turnover <strong>of</strong> Rs. 15<br />
Crore during the last 3 financial years (2007-08, 2008-09, 2009-10).. The sum <strong>of</strong> the average annual<br />
turnovers <strong>of</strong> all the partners <strong>of</strong> the consortium should be a minimum <strong>of</strong> Rs. 10.00 Crore during the last 3<br />
financial years (2007-08, 2008-09, 2009-10), as evidenced by the relevant financial statements and audited<br />
accounts <strong>of</strong> the company. Note: If audited figure <strong>of</strong> year 2009-10 is available then in that case last three<br />
years will be year 2007-08,2008-09 and 2009-10.<br />
d. The bidder, including all the partners <strong>of</strong> the consortium should have sufficient experience across the three<br />
major requirements <strong>of</strong> the project in Ground Survey (preferably Cadastral Survey) evidenced by the<br />
certificates issued by the competent authority <strong>of</strong> the concerned client organizations.<br />
e. The bidder should have executed in the last 3 years either a minimum <strong>of</strong> 1 project <strong>of</strong> Rs. 1 crore<br />
Or<br />
One project <strong>of</strong> Rs. 75.00 lakh and one project <strong>of</strong> Rs. 50.00 lakh<br />
Or<br />
a minimum <strong>of</strong> 7 projects <strong>of</strong> Rs. 20.00 lakh each.<br />
( NB: 1 Only completed projects will be considered 2. Project below value <strong>of</strong> Rs. 20.00 Lakh will<br />
not be considered at all )<br />
Reminder: 1<br />
Pre-Qualification BID COVER must contain EMD in original , pro<strong>of</strong> <strong>of</strong><br />
experience in business , pro<strong>of</strong> <strong>of</strong> turnover & pro<strong>of</strong> <strong>of</strong> survey turnover i.e<br />
project completion certificate .<br />
EVALUATION OF TECHNICAL PROPOSALS<br />
The evaluation <strong>of</strong> the Technical bids will be carried out in the following manner:<br />
a. The Technical Bids <strong>of</strong> only the pre-qualified bidders will be opened for evaluation.<br />
b. The bidders' technical solution proposed in the bid document would be evaluated as per the requirements<br />
specified in the RFP and adopting the evaluation criteria spelt out in this document. The Bidders are<br />
required to submit all required documentation in support <strong>of</strong> the evaluation criteria specified (e.g. detailed<br />
project citations and completion certificates, client contact information for verification, pr<strong>of</strong>iles <strong>of</strong> project<br />
resources, specifications <strong>of</strong> equipment proposed to be used) as required for technical evaluation. The<br />
Technical evaluation shall be done as per the criteria specified in Annexure II.<br />