RFP for ANAND & other Seven DISTRICTS Resurvey project<br />

iii. Accuracy levels required: same as their respective control point<br />

The description <strong>of</strong> the location <strong>of</strong> the control point along with a sketch shall be submitted to<br />

SC&DLR.<br />

Note: In case any village tri-junction has not been marked and monumented by any <strong>of</strong> the<br />

primary or secondary control points or even if it is tertiary control points, then they should be<br />

explicitly monumented as per the parameters mentioned for secondary control points.<br />

(1) The coordinate lists and descriptions <strong>of</strong> the locations shall be submitted to<br />

SC&DLR .The locations and ID s <strong>of</strong> all the control points should be<br />

maintained in GIS Form.<br />

(2) The coordinate list should be supplied both for geodetic system (lat/long)<br />

and Projected system-Universal Traverse Mercator , i.e the UTM projection<br />

<strong>of</strong> the respective area<br />

(3) In case a village tri-junctions has not marked and monumented by primary,<br />

secondary, or tertiary control points, the same should be monumented as per<br />

the parameters.<br />

General Requirements<br />

1. Village boundaries are to be marked.<br />

2. The(X, Y, Z) coordinates for the control points should be given in spherical coordinates<br />

as well as in Cartesian coordinates separately.<br />

3. The (X, Y) coordinates should be in WGS 84.and Z in MSL( Mean Sea Level)<br />

4. The agency should specify the conditions and specification <strong>of</strong> the instruments/system<br />

used to acquire the required accuracy.<br />

5. Some base lines for calibration with monumentation should be formed at selected<br />

locations for maintenance.<br />

6. A sketch for each category <strong>of</strong> control points shall be submitted showing the location <strong>of</strong><br />

control points along with description for easy identification.<br />

7. A district map showing all the Primary, secondary and tertiary control points with<br />

coordinates shall be submitted to the SC&DLR.<br />

2/22/2011<br />