09.01.2015 Views

Download - Department of Land Resources

Download - Department of Land Resources

Download - Department of Land Resources

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RFP for ANAND & other Seven DISTRICTS Resurvey project<br />

a. Rock Stone or Sand Stone 23*23*75 cm or RCC<br />

b. The control point should be 15 cm above the ground and 60 cm inside the ground.<br />

c. The control points should be fixed to the ground using at least 15cm <strong>of</strong> cement<br />

block<br />

d. Monuments shall bear a Triangle on top with plummet hole in the middle .<br />

Monumentation can be done by engraving the control points by 1 “ dia circle.<br />

e. Provision to put GPS reading strip <strong>of</strong> granite.<br />

f. The control point number should be inscribed on the monument.<br />

g. X, Y and Z co-ordinates are required.<br />

3. Tertiary Control Points:<br />

i. What kind <strong>of</strong> places: Preferred places area Village boundary tri-junction or bijunction,<br />

Government lands etc., Field tri-junction on village boundaries or inside the<br />

village. Existing Govt/ non-Govt buildings like GP <strong>of</strong>fice, school building, veterinary<br />

hospital, high tension lines etc.<br />

ii. Densification: 1 km average<br />

iii. Instrument: DGPS/ETS<br />

iv. Accuracy levels required : 1 in 10,000<br />

v. Monumentation <strong>of</strong> Tertiary Control Points<br />

a. Rock Stone or Sand Stone 15*15*45 cm or RCC<br />

b. The control point should be 10 cm above the ground and 35 cm inside the ground.<br />

c. The control points should be fixed to the ground using at least 15cm <strong>of</strong> cement<br />

block<br />

d. Monuments shall bear a Triangle on top with plummet hole in the middle .<br />

Monumentation can be done by engraving the control points by 1 “ dia circle.<br />

e. Provision to put GPS reading strip <strong>of</strong> granite.<br />

f. The control point number should be inscribed on the monument.<br />

4. Auxiliary Control Point:<br />

What kind <strong>of</strong> places: Each control point (Primary, Secondary and Tertiary Control<br />

Points) shall be accompanied with one auxiliary control point. It should be located on<br />

permanent structure like bridges, culverts and other permanent building corners etc.<br />

The auxiliary control point should be within the line <strong>of</strong> sight from the control points<br />

i. Densification: There shall be one auxiliary point for each control point typically<br />

200m or more (Primary, Secondary and Tertiary control point)<br />

ii. Instrument: DGPS and ETS<br />

39<br />

2/22/2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!