RFP for ANAND & other Seven DISTRICTS Resurvey project<br />
a. Rock Stone or Sand Stone 23*23*75 cm or RCC<br />
b. The control point should be 15 cm above the ground and 60 cm inside the ground.<br />
c. The control points should be fixed to the ground using at least 15cm <strong>of</strong> cement<br />
block<br />
d. Monuments shall bear a Triangle on top with plummet hole in the middle .<br />
Monumentation can be done by engraving the control points by 1 “ dia circle.<br />
e. Provision to put GPS reading strip <strong>of</strong> granite.<br />
f. The control point number should be inscribed on the monument.<br />
g. X, Y and Z co-ordinates are required.<br />
3. Tertiary Control Points:<br />
i. What kind <strong>of</strong> places: Preferred places area Village boundary tri-junction or bijunction,<br />
Government lands etc., Field tri-junction on village boundaries or inside the<br />
village. Existing Govt/ non-Govt buildings like GP <strong>of</strong>fice, school building, veterinary<br />
hospital, high tension lines etc.<br />
ii. Densification: 1 km average<br />
iii. Instrument: DGPS/ETS<br />
iv. Accuracy levels required : 1 in 10,000<br />
v. Monumentation <strong>of</strong> Tertiary Control Points<br />
a. Rock Stone or Sand Stone 15*15*45 cm or RCC<br />
b. The control point should be 10 cm above the ground and 35 cm inside the ground.<br />
c. The control points should be fixed to the ground using at least 15cm <strong>of</strong> cement<br />
block<br />
d. Monuments shall bear a Triangle on top with plummet hole in the middle .<br />
Monumentation can be done by engraving the control points by 1 “ dia circle.<br />
e. Provision to put GPS reading strip <strong>of</strong> granite.<br />
f. The control point number should be inscribed on the monument.<br />
4. Auxiliary Control Point:<br />
What kind <strong>of</strong> places: Each control point (Primary, Secondary and Tertiary Control<br />
Points) shall be accompanied with one auxiliary control point. It should be located on<br />
permanent structure like bridges, culverts and other permanent building corners etc.<br />
The auxiliary control point should be within the line <strong>of</strong> sight from the control points<br />
i. Densification: There shall be one auxiliary point for each control point typically<br />
200m or more (Primary, Secondary and Tertiary control point)<br />
ii. Instrument: DGPS and ETS<br />