RFP for ANAND & other Seven DISTRICTS Resurvey project<br />
Annexure I Ground Control Network & Monumentation<br />
There shall be Ground control Network at 4 levels (incase <strong>of</strong> non availability <strong>of</strong> (SOI) data,<br />
GCN at 5 level<br />
All the control points should be based on datum given below:<br />
Horizontal Datum : WGS-84 (i.e. the latest version <strong>of</strong> the World Geodetic System standard<br />
for use in cartography)<br />
The Primary Control points <strong>of</strong> the Survey <strong>of</strong> India (SOI), provided by static GPS observations<br />
(72 hours) with dual frequency GPS receivers, should be used as reference points for<br />
preparing district net work to link the district with national survey net work.<br />
In case <strong>of</strong> non availability <strong>of</strong> SOI data <strong>of</strong> network control points ,same kind <strong>of</strong> data and<br />
control points should be established in consultation with SOI and prepared by the vendor<br />
with MSL datum as per below mentioned standards .<br />
Base Station: At centre <strong>of</strong> Area <strong>of</strong> Interest (AOI) With minimum 72 hour observation by<br />
GPS with accuracy <strong>of</strong> 1:100000<br />
Regional Station: Control point at a distance <strong>of</strong> 40 k.m. average with a minimum 24 hour<br />
observation with GPS at a accuracy <strong>of</strong> 1: 50000<br />
The primary control points <strong>of</strong> the SOI Should have been post processed with the precise<br />
ephemeris adjusted with the help <strong>of</strong> precise engineering s<strong>of</strong>t ware (eg. Berenese s/w ) to the<br />
ITRF co-ordinate system or with a consultation <strong>of</strong> Survey <strong>of</strong> India . All the primary and<br />
secondary control points <strong>of</strong> districts should be connected to base and regional station <strong>of</strong> the<br />
SOI as created above, to ensure connection to the National Framework.<br />
Vertical Datum: MSL, i.e. mean Sea Level. The precision Bench Mark <strong>of</strong> the SOI should<br />
be used as primary vertical control<br />
1. Primary Control Points:<br />
Horizontal<br />
i. What kind <strong>of</strong> places: In protected areas like premises <strong>of</strong> permanent government<br />
<strong>of</strong>fices etc. The selected site should be open and clear to sky with acute angle <strong>of</strong> 15<br />
degree. High tension power lines, transformers, electric substations ,microwave<br />