RFP for ANAND & other Seven DISTRICTS Resurvey project<br />
POST SURVEY ACTIVITIES<br />
<br />
<br />
<br />
<br />
<br />
Generate various records based on the re-survey and information gathered from the field.<br />
In particular generate a discrepancy register which gives the details <strong>of</strong> land parcels<br />
showing the area difference between re-survey and old survey records/VF 7/12.<br />
In case where the area <strong>of</strong> resurveyed land parcel is more than 5% and such land parcel has<br />
non private land (govt. or semi-govt. land) on any <strong>of</strong> its side.<br />
Digitize the old tippan <strong>of</strong> the survey number and superimpose on the resurveyed parcel<br />
land showing the variation on the map as well as on the area. The encroached area (<strong>of</strong><br />
adjoining Govt. or Panchayata land)is to be shown by dotted lines and given a different<br />
shading and encroachment land register, in prescribed format generated and submitted.<br />
The Survey agency needs to create the Encroachment Register.<br />
Handing over the record for promulgation to the specified government <strong>of</strong>ficial who would<br />
take up the promulgation activity. This activity is to be done by the specified government<br />
<strong>of</strong>ficial.<br />
Generate one register for new survey no. arising out <strong>of</strong> resurvey with no corresponding old<br />
survey no. (Encroachment Register), another register with old survey no. without any<br />
corresponding new nos. and another one where either the occupant or land use is different.<br />
4.5 PILOT IMPLEMENTATION<br />
Selected bidder will be required to implement a pilot project using network data in three<br />
identified villages , using pure ground truthing technology, within a period <strong>of</strong> six weeks<br />
from issue <strong>of</strong> Letter <strong>of</strong> Intent – which will cover all the activities <strong>of</strong> the resurvey and all<br />
required outputs/deliverables . Based on the pilot experience, changes, if any needed would<br />
be made to the project implementation approach and plan.<br />
2/22/2011<br />
27