RFP for Resurvey project - Gandhinagar & other Five Districts <strong>of</strong> Gujarat State<br />

5. Reports<br />

The Survey Agency has to submit the reports as mentioned in the RFP.<br />

6. Time schedule for submission <strong>of</strong> reports<br />

The total time frame for carrying out the assignment would be 24 months from start i.e. 15 days from the<br />

date <strong>of</strong> issue <strong>of</strong> Letter <strong>of</strong> Intent. The details <strong>of</strong> work plan, timeframe for each stage <strong>of</strong> project is put up at<br />

Annexure III – Inception Report. During the course <strong>of</strong> action for providing feedback and comments, the<br />

timelines consumed by the Client will not be taken into account for calculating the scheduled timelines by<br />

the Survey Agency.<br />

7. Liquidated Damages for late submission<br />

The Survey Agency should submit his own detailed time schedule with measurable milestones and such<br />

schedules should be practicable, reasonable and balanced.<br />

<br />

<br />

<br />

<br />

Any delay in implementation will attract a penalty <strong>of</strong> 0.5% <strong>of</strong> the Agreement value for every 7 days,<br />

subject to a maximum <strong>of</strong> 4%.<br />

Maximum delay permitted will be 60 days, beyond which the agreement is liable to be terminated<br />

and the Survey Agency performance guarantee will be forfeited.<br />

In such case, SC&DLR reserves the right to make necessary alternate arrangements to complete the<br />

project.<br />

Further any delays must be made up by the Survey Agency by the time <strong>of</strong> the payment milestone<br />

for the completion <strong>of</strong> 75% i.e. project implementation needs to be as per schedule at this point.<br />

The purpose <strong>of</strong> this is to ensure all necessary formalities for project completion and closure are completed as<br />

planned and vendor will not deliver/ complete a large part <strong>of</strong> the work only at the end stage, as this would<br />

hinder smooth project completion and sign-<strong>of</strong>f. Penalties if deducted earlier will be refunded at this stage.<br />

8. Termination <strong>of</strong> the Agreement<br />

8.1. The Client reserves the right to cancel the Agreement at any time if it is not satisfied with the services<br />

<strong>of</strong> the Survey Agency or there is breach <strong>of</strong> any <strong>of</strong> the condition <strong>of</strong> this Agreement by the Survey<br />

Agency, provided a period <strong>of</strong> 30 days has lapsed from the date <strong>of</strong> serving notice on the Survey<br />

Agency requiring it to remedy the breach and if the breach has continued up to the date <strong>of</strong> the action.<br />

In this event, the work done till then by the Survey Agency shall be taken over by the Client. The<br />

Client reserves the right to appoint a new Survey Agency and hand over to him all the documents to<br />

complete the assignment. The Survey Agency in such case, upon termination, the Client may also<br />