RFP for Resurvey project - Gandhinagar & other Five Districts <strong>of</strong> Gujarat State<br />

The Survey Agency would follow a methodology to carry out the proposed project. The methodology<br />

should be such as prescribed in the Technical bid and as finalized in the Inception Report as per Annexure -<br />

III.<br />

If any modifications in the report or in plans and sections are required, due to attributable reasons to the<br />

Survey Agency or if any additional work relevant to the project (which is within the Scope <strong>of</strong> Work) is<br />

required to be carried out for preparation <strong>of</strong> reports <strong>of</strong> high pr<strong>of</strong>essional quality (as agreed in the Scope <strong>of</strong><br />

Work - Annexure – I and in the Inception Report – Annexure III submitted by the Survey Agency)<br />

acceptable to the approving authorities shall be carried out without any additional compensation.<br />

1.1. Commencement Date<br />

The Survey Agency shall commence the Services as soon as possible but not later than 15 days after the<br />

Client has given notice to proceed with the Services (Letter <strong>of</strong> Intent).<br />

1.2. Additional Work<br />

If, in the opinion <strong>of</strong> the Client, it is necessary to carry out any work outside to the Scope <strong>of</strong> Work for the<br />

purposes <strong>of</strong> the Project in addition to the Services, the Survey Agency shall carry out such additional work<br />

with the prior authorization <strong>of</strong> the Client. The charges for the personnel required for such additional work<br />

would be as per the area <strong>of</strong> the surveyed area quoted by the bidder and mentioned in Section 4.1.<br />

In case there is any dispute about determining whether any work proposed is within or out side the Scope <strong>of</strong><br />

Work mentioned in the RFP – (Annexure I), the decision <strong>of</strong> Client shall be final and binding on the Survey<br />

Agency.<br />

1.3. Additional Scope – NLRMP Guideline<br />

New NLRMP guidelines have been issued by the Ministry <strong>of</strong> Rural Development, Government <strong>of</strong> India. The<br />

Client conceives for the Survey Agency to implement these new guidelines for the resurvey <strong>of</strong> Gandhinagar<br />

District. The Survey Agency has identified work elements that are outside the scope <strong>of</strong> the original Scope <strong>of</strong><br />

Work mentioned in the RFP (Annexure I). The Client authorizes the Survey Agency to incorporate these<br />

new work elements into the Project. The Survey Agency undertakes to execute these work elements. The<br />

cost for such additional work may be considered by the Client in due course and the decision <strong>of</strong> the Client<br />

shall be final and binding on the Survey Agency<br />

1.4. Other Documents<br />

RFP document including any amendments made to it at the bidding stage, Survey Agency’s bid <strong>of</strong>fer<br />

documents, Scope <strong>of</strong> Work, Inception Report shall form part <strong>of</strong> the Agreement.<br />

2. Personnel<br />