Batch User Guide produced by CRIF - Janata Bank
Batch User Guide produced by CRIF - Janata Bank Batch User Guide produced by CRIF - Janata Bank
6.5 RE-OPENING OF TERMINATED/TERMINATED IN ADVANCE LOANS In case the phase of a contract was incorrectly contributed as terminated/terminated in advance (TM/TA), in order to correct this and restore the original status, the FI has simply to send again the contract with phase living (LV) through the monthly batch contribution. This will automatically solve the problem. 92 of 92
- Page 41 and 42: Body for Record Type: Cards contrac
- Page 43 and 44: data belong 9 24 F.I. Subject Code
- Page 45 and 46: 108 117 Error Code See table errors
- Page 47 and 48: Q T C S Y I quarterly instalments-9
- Page 49 and 50: 034 Merchandise Export Commodities
- Page 51 and 52: 113303 Bangla Academy 113304 Bangla
- Page 53 and 54: 121710 Ansar-VDP Development Bank 1
- Page 55 and 56: 909299 Others 909100 Insurance Comp
- Page 57 and 58: BU MC BC BB MS TR PH MP MT FI BS PC
- Page 59 and 60: 2102 Electric / Electronic Goods (F
- Page 61 and 62: 8412 Chemicals (except Medicine) 84
- Page 63 and 64: EL SALVADOR EQUATORIAL GUINEA ERITR
- Page 65 and 66: NORWAY OMAN PAKISTAN PALAU PALESTIN
- Page 67 and 68: AWG AZN BAM BBD BDT BGN BHD BIF BMD
- Page 69 and 70: NIO NOK NPR NZD OMR PAB PEN PGK PHP
- Page 71 and 72: Jhalokathi Jinaidaha Joypurhat Khag
- Page 73 and 74: 4 053 Multiple headers in Subject f
- Page 75 and 76: 10 157 Total financed amount = [0]
- Page 77 and 78: 10 345 Contract refers to subject i
- Page 79 and 80: Company 1: Individual 2: 79 of 92
- Page 81 and 82: Contracts file: Non instalment Cont
- Page 83 and 84: Subject information for Proprietors
- Page 85 and 86: Please note: this does not apply to
- Page 87 and 88: 31/03/2008 500,000 1,000,000 30/04/
- Page 89 and 90: epay a non instalment loan that is
- Page 91: - Contract Type = must be the same
6.5 RE-OPENING OF TERMINATED/TERMINATED IN ADVANCE LOANS<br />
In case the phase of a contract was incorrectly contributed as terminated/terminated in advance<br />
(TM/TA), in order to correct this and restore the original status, the FI has simply to send again<br />
the contract with phase living (LV) through the monthly batch contribution. This will automatically<br />
solve the problem.<br />
92 of 92