Batch User Guide produced by CRIF - Janata Bank

Batch User Guide produced by CRIF - Janata Bank Batch User Guide produced by CRIF - Janata Bank

rupalibank.org
from rupalibank.org More from this publisher
09.01.2015 Views

6.5 RE-OPENING OF TERMINATED/TERMINATED IN ADVANCE LOANS In case the phase of a contract was incorrectly contributed as terminated/terminated in advance (TM/TA), in order to correct this and restore the original status, the FI has simply to send again the contract with phase living (LV) through the monthly batch contribution. This will automatically solve the problem. 92 of 92

6.5 RE-OPENING OF TERMINATED/TERMINATED IN ADVANCE LOANS<br />

In case the phase of a contract was incorrectly contributed as terminated/terminated in advance<br />

(TM/TA), in order to correct this and restore the original status, the FI has simply to send again<br />

the contract with phase living (LV) through the monthly batch contribution. This will automatically<br />

solve the problem.<br />

92 of 92

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!