4<br />
Fix GTEC T-Bar Cross T TC1200 to GTEC Primary<br />
Main T TP3700 at typical 400mm centres to<br />
form grid pattern. Push-fit until clip is locked<br />
into position, with the triangle shape (spring<br />
side) of the clip visible on each side.<br />
To remove GTEC T-Bar Cross T TC1200,<br />
press on end of connector clip and<br />
pull out (may require some slight<br />
twisting).<br />
5<br />
Position the boards with long edges parallel to the GTEC<br />
T-Bar Primary Main T TP3700, with adjoining edges lightly<br />
butted. Board edge must be positioned at the centre of the<br />
GTEC T-Bar Cross T TC1200 section, staggered by half a<br />
board length whenever possible.<br />
Screw fix the plasterboard at 230mm max centres with<br />
drywall GTEC Self Tapping screws on the GTEC T-Bar Cross T<br />
TC1200, 10mm minimum from the edge of the board.<br />
Screw fix the cut edges of the plasterboard at 150mm max<br />
centres to the T-Bar. Also screw fix all perimeter boards to<br />
the GTEC T-Bar Edge Channel TE300 at 150mm centres.<br />
When using double layer plasterboard, the first layer is fixed<br />
as step 5 and the second layer should be fixed with all<br />
joints staggered in relation to the first layer.<br />
THE INSTALLATION HANDBOOK 2008<br />