INSTALLATION<br />

1<br />

Mark the position on walls for the finished<br />

ceiling height taking into account the<br />

thickness and number of layers of<br />

plasterboard to be used. Fix the GTEC T-Bar<br />

Edge Channel TE3000 to walls at 600mm<br />

maximum centres (short length uppermost).<br />

2<br />

Cut the GTEC T-Bar Corridor Span T TS2000 as<br />

required to the corridor width and slide into<br />

GTEC T-Bar Edge Channel TE3000, at<br />

recommended centres (400 or 450mm).<br />

If hangers are required (see span table), fix the<br />

GTEC T-Bar Corridor Span T TS2000 to the GTEC<br />

Metal Angle with 2 GTEC Pan Head Self Tapping<br />

screws.<br />

70 THE INSTALLATION HANDBOOK 2008