The Installation Handbook - Howarth Timber
The Installation Handbook - Howarth Timber
The Installation Handbook - Howarth Timber
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4<br />
Secure the GTEC Ceiling Channels at right<br />
angles to the underside of the GTEC Primary<br />
Channels, at centres as specified in table 2,<br />
using GTEC Connecting Clips.<br />
For the entire length of each GTEC Primary<br />
Channel, alternate GTEC Connecting Clips on<br />
each side.<br />
5<br />
Position the boards with bound (long) edges<br />
at right angles to the GTEC Ceiling Channel<br />
sections, with adjoining edges lightly butted.<br />
End joints must occur at the centre of the GTEC<br />
Ceiling Channel section, staggered by half a<br />
board length whenever possible.<br />
6<br />
Across field of board, screw-fix the plasterboard<br />
at 230mm max. centres with GTEC Self<br />
Tapping screws.<br />
Screw fix the cut edges of the plasterboard<br />
at 150mm max. centres to the GTEC Ceiling<br />
Channel. Similarly screw fix all edges to the<br />
GTEC Edge Channel at 150mm centres.<br />
THE INSTALLATION HANDBOOK 2008<br />
65