INSTALLATION<br />
1<br />
Mark the position on walls for the finished<br />
ceiling height taking into account the thickness<br />
and number of layers of plasterboard to be<br />
used. Fix the GTEC Edge Channels to walls at<br />
600mm maximum centres.<br />
For the location of the GTEC Primary Channels,<br />
mark lines on the ceiling at centres in<br />
accordance with the thickness and number<br />
of layers to be used. See table 1.<br />
2<br />
Attach GTEC Soffit Cleats to the structural soffit<br />
at 1200mm centres along the centre lines for<br />
GTEC Primary Channels.<br />
Cut lengths of GTEC Metal Angle equal to the<br />
vertical distance from the GTEC Soffit Cleats to<br />
the top of the edge channels. Fix GTEC Metal<br />
Angle to the GTEC Soffit Cleats with appropriate<br />
Nut and Bolt.<br />
A GTEC Soffit Cleat is not required for timber joist<br />
floors. Instead, fix GTEC Metal Angles direct to the<br />
sides of timber joist with a minimum overlap of<br />
50mm using a minimum of 2 suitable fixings.<br />
3<br />
Fix GTEC Primary Channel to GTEC Metal Angles<br />
with two GTEC Pan Head Self Drilling screws.<br />
Where necessary, join the GTEC Primary Channel<br />
by overlapping 150mm back to back and fixing<br />
with two appropriate Nuts and Bolts.<br />
64 THE INSTALLATION HANDBOOK 2008