GTEC Primary Channel<br />
GTEC Connecting Clip<br />
60 x 60mm rock mineral<br />
wool insulation<br />
Movement control joints<br />
<strong>The</strong> continuity of the plasterboard and supporting structure<br />
should be broken by movement control joints:<br />
1. Where the ceiling runs 10 metres or more in any<br />
direction<br />
2. Where the ceiling crosses structural movement joints.<br />
GTEC Ceiling Channel<br />
Ceiling Channel A<br />
GTEC Movement Control Joint<br />
60 x 100mm rock mineral<br />
wool insulation<br />
Ceiling Channel B<br />
Movement joints running parallel to the<br />
Ceiling Channels:<br />
Locate GTEC Ceiling Channels along each side 60mm from<br />
the movement joint (measured to centres). Secure GTEC<br />
Ceiling Channels to GTEC Primary Channels with GTEC<br />
Connecting Clips.<br />
Leave a 12.5mm gap in the runs of GTEC Primary Channel<br />
as wide as the movement joint, and support the cut ends<br />
of the GTEC Primary Channels with hangers. When<br />
boarding the ceiling, leave a 12.5mm continuous gap along<br />
the line of the movement joint.<br />
GTEC Metal Angle<br />
GTEC Ceiling<br />
Channel<br />
GTEC Edge Channel<br />
GTEC Movement<br />
Control Joint<br />
GTEC Primary Channel<br />
GTEC Ceiling<br />
Channel fixed<br />
vertically to edge<br />
channels at top and<br />
bottom.<br />
GTEC Edge Channel<br />
Movement joints running across the<br />
Ceiling Channels<br />
Form a 12.5mm gap along the line of the movement joint,<br />
supported by GTEC Primary Channels 60mm from each<br />
side of the joint. <strong>The</strong> GTEC Ceiling Channels A and B<br />
should overlap by 50mm but not fixed.<br />
To maintain the acoustic and fire integrity of the ceiling,<br />
pack the space behind the joint with 60mm rock mineral<br />
wool insulation with a density of 23 kg/m 3 .<br />
When boarding the ceiling, leave a 12.5mm continuous<br />
gap along the line of the movement joint.<br />
Ceiling Recess<br />
Ceiling recess detail incorporating a change in ceiling<br />
height is suitable for a maximum change in level<br />
of 600mm.<br />