GTEC Primary Channel<br />

GTEC Connecting Clip<br />

60 x 60mm rock mineral<br />

wool insulation<br />

Movement control joints<br />

<strong>The</strong> continuity of the plasterboard and supporting structure<br />

should be broken by movement control joints:<br />

1. Where the ceiling runs 10 metres or more in any<br />

direction<br />

2. Where the ceiling crosses structural movement joints.<br />

GTEC Ceiling Channel<br />

Ceiling Channel A<br />

GTEC Movement Control Joint<br />

60 x 100mm rock mineral<br />

wool insulation<br />

Ceiling Channel B<br />

Movement joints running parallel to the<br />

Ceiling Channels:<br />

Locate GTEC Ceiling Channels along each side 60mm from<br />

the movement joint (measured to centres). Secure GTEC<br />

Ceiling Channels to GTEC Primary Channels with GTEC<br />

Connecting Clips.<br />

Leave a 12.5mm gap in the runs of GTEC Primary Channel<br />

as wide as the movement joint, and support the cut ends<br />

of the GTEC Primary Channels with hangers. When<br />

boarding the ceiling, leave a 12.5mm continuous gap along<br />

the line of the movement joint.<br />

GTEC Metal Angle<br />

GTEC Ceiling<br />

Channel<br />

GTEC Edge Channel<br />

GTEC Movement<br />

Control Joint<br />

GTEC Primary Channel<br />

GTEC Ceiling<br />

Channel fixed<br />

vertically to edge<br />

channels at top and<br />

bottom.<br />

GTEC Edge Channel<br />

Movement joints running across the<br />

Ceiling Channels<br />

Form a 12.5mm gap along the line of the movement joint,<br />

supported by GTEC Primary Channels 60mm from each<br />

side of the joint. <strong>The</strong> GTEC Ceiling Channels A and B<br />

should overlap by 50mm but not fixed.<br />

To maintain the acoustic and fire integrity of the ceiling,<br />

pack the space behind the joint with 60mm rock mineral<br />

wool insulation with a density of 23 kg/m 3 .<br />

When boarding the ceiling, leave a 12.5mm continuous<br />

gap along the line of the movement joint.<br />

Ceiling Recess<br />

Ceiling recess detail incorporating a change in ceiling<br />

height is suitable for a maximum change in level<br />

of 600mm.<br />