The Installation Handbook - Howarth Timber
The Installation Handbook - Howarth Timber
The Installation Handbook - Howarth Timber
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INSTALLATION<br />
1<br />
Mark position on walls for desired clear<br />
space/ceiling height, taking into account<br />
the thickness and number of layers of<br />
plasterboards to be used. Fix the GTEC<br />
Dryliner Track RD9 to walls and around<br />
columns etc at 600mm maximum centres.<br />
Mark walls on the underside of the GTEC<br />
Dryliner Tracks that are parallel to joists for<br />
position of the GTEC Dryliner Channels RD1.<br />
Spacing as table 1.<br />
2<br />
Set levels and secure the GTEC Dryliner Joist<br />
Connecter RD5 or RD10, depending on cavity<br />
depth, to side of joist, on line of GTEC Dryliner<br />
Channel with two 32mm GTEC High Thread<br />
screws 32DHT1000 spaced as table 2. Ensure<br />
GTEC Joist Connectors are level.<br />
3<br />
Offer the GTEC Dryliner Channel to the GTEC<br />
Joist Connectors and twist to secure. Where<br />
necessary extend the length of the GTEC<br />
Dryliner Channel by connecting two lengths<br />
of GTEC Dryliner Channel together with GTEC<br />
Dryliner Channel Connector RD3.<br />
58 THE INSTALLATION HANDBOOK 2008