08.01.2015 Views

The Installation Handbook - Howarth Timber

The Installation Handbook - Howarth Timber

The Installation Handbook - Howarth Timber

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INSTALLATION<br />

1<br />

Mark position on walls for desired clear<br />

space/ceiling height, taking into account<br />

the thickness and number of layers of<br />

plasterboards to be used. Fix the GTEC<br />

Dryliner Track RD9 to walls and around<br />

columns etc at 600mm maximum centres.<br />

Mark walls on the underside of the GTEC<br />

Dryliner Tracks that are parallel to joists for<br />

position of the GTEC Dryliner Channels RD1.<br />

Spacing as table 1.<br />

2<br />

Set levels and secure the GTEC Dryliner Joist<br />

Connecter RD5 or RD10, depending on cavity<br />

depth, to side of joist, on line of GTEC Dryliner<br />

Channel with two 32mm GTEC High Thread<br />

screws 32DHT1000 spaced as table 2. Ensure<br />

GTEC Joist Connectors are level.<br />

3<br />

Offer the GTEC Dryliner Channel to the GTEC<br />

Joist Connectors and twist to secure. Where<br />

necessary extend the length of the GTEC<br />

Dryliner Channel by connecting two lengths<br />

of GTEC Dryliner Channel together with GTEC<br />

Dryliner Channel Connector RD3.<br />

58 THE INSTALLATION HANDBOOK 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!