08.01.2015 Views

The Installation Handbook - Howarth Timber

The Installation Handbook - Howarth Timber

The Installation Handbook - Howarth Timber

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CEILINGS: GTEC Dryliner<br />

GTEC Dryliner<br />

Channel Connector<br />

Joist<br />

GTEC Joist<br />

Connector<br />

Mineral Wool Batts<br />

GTEC Dryliner Channel<br />

Double Layer Boarding<br />

Note: With two-layer<br />

boarding, stagger joints<br />

and fixings between layers.<br />

Table 3: Selection of Dryliner components<br />

Component Lafarge Length Maximum <strong>Timber</strong> Concrete<br />

code (mm) cavity (mm) floors floors<br />

GTEC Dryliner Channel RD1 2400, 3000 - ✓ ✓<br />

GTEC Dryliner Channel Connector RD3 100 - ✓ ✓<br />

GTEC Joist Connector RD5 - 65 ✓ -<br />

RD10 - 120 ✓ -<br />

GTEC Dryliner Track RD9 3000 - ✓ ✓<br />

GTEC High Thread screw 32DHT1000 32 - ✓ -<br />

GTEC SR Bracket RD2 - 25-60 ✓* ✓<br />

GTEC XR Bracket RD11 - 25-130 ✓* ✓<br />

GTEC Self Tapping screws 25DST1000 25<br />

41DST1000 41<br />

GTEC Pan Head screws 11PHST500 11 - - ✓<br />

*Used for upgrading of timber joist floors where existing ceiling is to be retained<br />

56 THE INSTALLATION HANDBOOK 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!