4<br />
Cut each GTEC Dryliner Channel RD1 5mm<br />
shorter than the floor to ceiling height. Locate<br />
the GTEC Dryliner Channel RD1 into GTEC<br />
Dryliner Track at floor and ceiling.<br />
Where wall height exceeds<br />
channel length, connect<br />
two lengths of channel<br />
together with GTEC Dryliner<br />
Channel Connector RD3.<br />
5<br />
Ensure the channel is plumb, and secure to<br />
each bracket leg using GTEC Pan Head Self<br />
Tapping screws. Where necessary bend back<br />
the legs of the bracket so they do not protrude<br />
past the face of the channel.<br />
6<br />
Cut the plasterboard 5mm shorter than the<br />
floor-to-ceiling height, butt the board firmly<br />
against ceiling and fix the plasterboards to<br />
the framing with GTEC Self Tapping screws<br />
at 300mm centres.<br />
Butt the plasterboard edges lightly against<br />
each other and centre the edges over the<br />
channels. Where the height of the lining is<br />
greater than the plasterboard length, use<br />
GTEC Fixing Channel to support the horizontal<br />
cut edges of the plasterboards.<br />
THE INSTALLATION HANDBOOK 2008<br />
23