Insulation<br />

Existing Wall<br />

Insulation - slit locally and slide<br />

behind channels<br />

Plasterboard<br />

Where required, insert mineral wool batts between the GTEC<br />

Dryliner Channels. To ensure that the batts continue behind<br />

the GTEC Dryliner Channels as an unbroken lining, slit the<br />

batts locally and slide across each GTEC SR Bracket. <strong>The</strong> use<br />

of GTEC Vapour Board should be considered to control<br />

condensation.<br />

Movement control joints<br />

GTEC Movement Control<br />

Joint<br />

Movement control joints are required in wall linings at<br />

intervals not exceeding 10m, and where the drylining crosses<br />

or abuts a structural movement joint. At movement control<br />

joints leave a 12.5mm opening between the plasterboards<br />

and use GTEC Dryliner Channels on each side of the joint to<br />

support the plasterboard edges.<br />

Cut GTEC Movement Control Joint to length. Butt joint<br />

lengths end to end where necessary. Attach to the board<br />

surface with 13mm stainless steel staples at 150mm<br />

centres. Apply GTEC Joint Filler or GTEC Allset, feathering<br />

out the edges of the second coat. After finishing, remove<br />

the masking strip from the centre<br />

of the joint.<br />

Internal Corners<br />

Where it is not possible to screw-fix one of the GTEC SR<br />

Bracket legs to the GTEC Dryliner Channel RD1, bend back<br />

the teeth of the GTEC SR Bracket RD2 so that they engage<br />

with the corner of the GTEC Dryliner Channel as shown and<br />

screw fix.<br />

Construction around doors<br />

1. At ceiling level, continue ceiling GTEC Dryliner Track<br />

across the door head.<br />

At floor level, turn floor GTEC Dryliner Track into reveals and<br />

butt against the door frame as shown.<br />

Fix the GTEC Dryliner Track RD9 to inside face of door<br />

frame with suitable fixings as shown.<br />

Internal Corners<br />

2. To form the external corner of each door opening, cut<br />

GTEC Dryliner Track 5mm less than floor-to-ceiling height.<br />

Cut back flange at uppermost end of GTEC Dryliner Track<br />

and fix to ceiling and floor GTEC Dryliner Tracks with GTEC<br />

Wafer Head Self Tapping screws.<br />

3. To form door head member use a section of GTEC Metal<br />

Angle 90 MFC2330 or GTEC Dryliner Track RD9 snipped<br />

and folded as shown. Attach to the vertical GTEC Metal<br />

Angles with GTEC Wafer Head Self Drilling screws.<br />

GTEC Dryliner Track<br />

Door reveal lining assembly<br />

THE INSTALLATION HANDBOOK 2008<br />