INSTALLATION<br />
1<br />
Apply a chalk line to floor and ceiling allowing<br />
for thickness of plasterboard or <strong>The</strong>rmal board<br />
plus a minimum 10mm of GTEC Universal<br />
Bonding Compound. See Table 1 for correct<br />
adhesive for the background surface.<br />
2<br />
Starting from a window, door reveal or internal<br />
angle mark wall vertically with chalk for the<br />
rows of dabs at the required centres, as set<br />
out in table 2. Allow for dabs at 25mm in from<br />
board vertical edges.<br />
3<br />
Apply continuous perimeter ribbon of GTEC<br />
Universal Bonding Compound at 50mm below<br />
ceiling line and 50mm above floor level.<br />
A continuous perimeter should also be applied<br />
around any service cut out i.e. light switches.<br />
10 THE INSTALLATION HANDBOOK 2008