Table 2: Use of GTEC Universal Bonding Compound<br />

Board Board Vertical Number of<br />

thickness width centres dabs across<br />

(mm) (mm) (mm) board<br />

9.5 900 450 3<br />

9.5 1200 400 4<br />

12.5 900 450 3<br />

12.5 1200 600 3<br />

GTEC Movement Control Joint<br />

Cavity barriers<br />

Certain floor/ceiling constructions can allow the circulation<br />

of air behind the GTEC <strong>The</strong>rmal Boards and air may also<br />

enter at junctions with partitions and door/window frames.<br />

This circulation can reduce the thermal performance of the<br />

wall. Building Regulations Approved Document L requires<br />

the application of continuous horizontal or vertical bands<br />

of GTEC Universal Bonding Compound around the specified<br />

wall perimeters, junctions and frames of linings to internal<br />

faces of external walls.<br />

Movement control joints<br />

Movement control joints are required in wall linings at intervals<br />

not exceeding 10 metres and where the drylining crosses or<br />

abuts a structural movement joint. At movement control joints<br />

leave a 12.5mm opening between the GTEC <strong>The</strong>rmal Boards<br />

and apply a continuous vertical ribbon of GTEC Universal<br />

Bonding Compound to each side of the joint, about 25mm in<br />

from the edge of the GTEC <strong>The</strong>rmal Board.<br />

Cut GTEC Movement Control Joint to length. Butt joint lengths<br />

end to end where necessary. Attach to the GTEC <strong>The</strong>rmal<br />

Bond surface with 13mm stainless steel staples at 150mm<br />

centres. Apply GTEC Joint Filler or GTEC Allset in two coats<br />

feathering out the edges of the second coat. After finishing,<br />

remove the masking strip from the centre of the joint.<br />

<strong>The</strong>rmal Board Linings (Direct Bond)<br />

25mm<br />

300mm<br />

Insert GTEC Nailable Plugs as indicated<br />

<strong>Installation</strong><br />

For GTEC <strong>The</strong>rmal Board linings, fix to wall with 2 nailable<br />

plugs per panel - see diagram for fixing positions. To install<br />

nailable plugs first drill two 6mm diameter holes through the<br />

GTEC <strong>The</strong>rmal Board and GTEC Universal Bonding<br />

Compound into the masonry background. Ensure each hole<br />

goes through a dab and penetrates the masonry by at least<br />

25mm. <strong>The</strong> maximum component thickness, including<br />

plaster or render, GTEC Universal Bonding Compound and<br />

GTEC <strong>The</strong>rmal Board that can be accommodated by each<br />

size plug is as follows: 60mm GTEC Nailable Plug - 35mm,<br />

80mm GTEC Nailable Plug - 55mm, 100mm GTEC<br />

Nailable Plug - 75mm and 120mm GTEC Nailable Plug -<br />

95mm. Insert GTEC Nailable Plugs and drive them just<br />

below the plasterboard surface, ensuring that the<br />

plasterboard paper liner remains intact.<br />

Door and window reveals<br />

Around door and window reveals of masonry construction,<br />

direct bond the GTEC <strong>The</strong>rmal Board to the background,<br />

as for main wall areas. Complete installation with a GTEC<br />

Nailable Plug at top and bottom of each reveal.<br />

THE INSTALLATION HANDBOOK 2008<br />