QPR for the quarter ending June/2007 on NH, CRF Works submitted ...
QPR for the quarter ending June/2007 on NH, CRF Works submitted ...
QPR for the quarter ending June/2007 on NH, CRF Works submitted ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4<br />
Annexure-II<br />
State:- Arunachal Pradesh Code Review m<strong>on</strong>th <str<strong>on</strong>g>June</str<strong>on</strong>g>'07 (Rs. In lakhs)<br />
Sl.<br />
No.<br />
<strong>NH</strong> No.<br />
Name of work<br />
Job No. Date of Sanc.<br />
Original/ Revised<br />
Likely cost<br />
of completi<strong>on</strong><br />
Sancti<strong>on</strong>ed<br />
cost<br />
Ori. / Rev.<br />
Length<br />
(KM) or<br />
Nos<br />
3/07 Actual<br />
Cummulative Expenditure<br />
6/07 Actual<br />
9/07 Actual<br />
12/07 Actual<br />
03/08 Actual<br />
STATUS OF ONGOING WORKS<br />
3/07 Actual<br />
Cummulative Physical Progress %<br />
6/07 Actual<br />
9/07 Actual<br />
12/07 Actual<br />
03/08 Actual<br />
Category<br />
Requirement of Funds/Allocati<strong>on</strong><br />
<str<strong>on</strong>g>2007</str<strong>on</strong>g>-08<br />
Requirement.<br />
<str<strong>on</strong>g>2007</str<strong>on</strong>g>-08<br />
Allocati<strong>on</strong>.<br />
2008-09<br />
Requirement.<br />
2008-09<br />
Allocati<strong>on</strong>.<br />
Original Date of<br />
Award of c<strong>on</strong>tract<br />
Completi<strong>on</strong> as per<br />
c<strong>on</strong>tract<br />
Revised<br />
Target /<br />
actual date<br />
of compln.<br />
Date of submissi<strong>on</strong> of RE / Est.<br />
No. Reqd.<br />
Name of<br />
agency<br />
Remarks /<br />
reas<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g><br />
slippage and<br />
acti<strong>on</strong> taken<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28<br />
COMPLETED WORKS<br />
A) ROAD WORK<br />
1<br />
2<br />
<strong>NH</strong>-153<br />
<strong>NH</strong>-153<br />
Strenghening of Still<br />
Well road from<br />
Jairampur to<br />
PanqsuPass. SH:-<br />
Formati<strong>on</strong> and<br />
Pavement (0-10Km.)<br />
aggretating to 9.735<br />
Km.<br />
Widening/ c<strong>on</strong>structi<strong>on</strong><br />
38 Nos. of RCC slab<br />
culverts and ear<str<strong>on</strong>g>the</str<strong>on</strong>g>n<br />
side drain from Km. 0/00<br />
to 10/00 <strong>NH</strong>-153.<br />
(Job No. 0153 Ar.P.2002-<br />
03-01) No. <strong>NH</strong>-<br />
12014/44/Ar.P/<strong>NH</strong>-10<br />
Dated 15-07-2002<br />
(Job No. 0153 Ar.P.2002-<br />
03-02) No. <strong>NH</strong>-<br />
12014/43/Ar.P/<strong>NH</strong>-10<br />
Dated 02-08-02<br />
400.62 10 Km. 418.78 418.78 - - - 100% 100% - - -<br />
180.80 38 Nos 174.19 174.19 - - - 100% 100% - - -<br />
Streng<str<strong>on</strong>g>the</str<strong>on</strong>g>ning<br />
Rec<strong>on</strong>structi<strong>on</strong><br />
of culverts<br />
418.78 0.00 0.00 - - 24/06/03 3/11/'04 28/1/05 - State<br />
PWD<br />
A.P.<br />
174.19 0.00 0.00 - - 13/12/02 23/04/04 6-11-04 - State<br />
PWD<br />
A.P.<br />
Work<br />
completed<br />
100% during<br />
2004-05<br />
Work<br />
completed<br />
100% during<br />
2004-05<br />
3<br />
<strong>NH</strong>-153<br />
Widening/ c<strong>on</strong>structi<strong>on</strong><br />
36 Nos. of RCC slab<br />
culverts and ear<str<strong>on</strong>g>the</str<strong>on</strong>g>n<br />
side drain from 10 to<br />
20 Km. <strong>NH</strong>-153.<br />
(Job No. 0153 Ar.P.2002-<br />
03-03) No. <strong>NH</strong>-<br />
12014/41/Ar.P/<strong>NH</strong>-10<br />
Dated 03-09-02<br />
168.57 36 Nos 130.90 130.90 - - - 100% 100% - - -<br />
Rec<strong>on</strong>structi<strong>on</strong> of culverts<br />
130.90 0.00 0.00 - - 03-07-03 17/05/04 25/10/04 - State<br />
PWD<br />
A.P.<br />
Work<br />
completed<br />
100% during<br />
2004-05<br />
4<br />
<strong>NH</strong>-153<br />
Stren<str<strong>on</strong>g>the</str<strong>on</strong>g>ning of Stil Well<br />
road from Jairampur to<br />
PanqsuPass. SH:-<br />
Formati<strong>on</strong> and<br />
Pavement<br />
(10-20 Km.)<br />
(Job No.0153 Ar.P 2003-<br />
04-05) No. <strong>NH</strong>-<br />
12014/19/2003/Ar.P/<strong>NH</strong>-<br />
10 Dated 8/8/03<br />
436.40 10 Km. 401.67 401.67 - - - 100% 100% - - -<br />
Streng<str<strong>on</strong>g>the</str<strong>on</strong>g>ning<br />
421.96 - - - - 01-08-04 18/1/2006 - -<br />
State PWD A.P.<br />
Work Comptd.<br />
During<br />
2005-06<br />
Total of A 1186.39 1125.54 1125.54 1145.83<br />
Page 4