7 Sl. No. Name of work Length in AA No. & Date & Amount Amount of Technical sancton & Date Item quantity unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 23 Improvement of NH.12031/29/2004/ SBC Grd-I 1.80 km Naharlagun Township /Ar.P/CRF/NH-10 BC Grd-II 1.80 km Roads Phase-II dtd.31.03.ong>2007ong> BC Grd-III 1.80 km 500.00 Carpetting 1.80 km Re-Carpetting 9.86 km Side drain 12269.00 mtr RCC S/cul 1.50 mtr 8 Nos. 24 C/o approach road to 2.25 km NH.12031/29/2004/ Sub Grade 2.25 km VKV at Dobi in Lower /Ar.P/CRF/NH-10 WBM-I 2.25 km Subansiri District, dtd.30.03.ong>2007ong> WBM-II 2.25 km Ziro 65.46 WBM-III 2.25 km Carpetting & Seal Coat 2.25 km Page 7 Scope of work Physical Progress in % Financial Progress Remarks Upto ong>theong> end During ong>theong> Total during ong>theong> Cummulative Upto ong>theong> During Total Cummulat of previous Qtr i.e.1st year upto end of qtr. end of ong>theong> Qtr during ong>theong> ive upto year (2006- under report previous year end of qtr. Qtr. i.e. 1st ong>2007ong>) year under qtr report 25 Construction of Double lane Road Arunchal University at Rono Hill, Doimukh (Pavement & Supplimentary works) 114.56 124.56 124.56 124.56 26 Improvement of Road from De-delo to Leporiaing in Ar.P 628.60 5433.69 0.00 0.00 5433.69 Note FC - Formation Cutting, Sol - Soling, Met - Metalling, Carpt - Carpetting, Cul - Culvert, New Emb - New Embankment, SMC - Soling Metalling Carpetting, SSI - Sub Soil Investigation, Abut - Abutment, Wid - Widening, W/wall - Wing wall, R/wall - Retaining wall Chief Engineer(EZ) PWD, AP, Itanagar. CRF/ong>QPRong> CRF ong>Juneong> ong>2007ong>

8 State : Arunachal Pradesh Department : PWD Sl. Name of work No. Date of Sanction Org. Sanction amount Org. Likely cost of completion Upto ong>theong> end of previous year STATUS OF CRF WORK LIABILITIES (ROADS) As on ong>Juneong> ong>2007ong> During ong>theong> Qtr i.e.1st qtr Total during ong>theong> year Cummulative upto end of qtr. under report Balance Requirement of fund ong>2007ong>-08 Position of revised estimate (Col 5 - 9) Liability Works Total Required Submit Date PDC Remarks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 Steel truss girder bridge 23/10/2001 434.88 442.00 474.91 0.00 0.00 474.91 ---- 4.00 4.00 Nil ---- ---- 2005-06 over river Dibang 2 Construction of 23/10/2001 1005.50 1081.00 795.64 - - 795.64 285.36 ---- 100.00 100.00 Nil ---- ---- 2005-06 Mebo-Dholla road 3 C/o Chowkham -Tezu 27/05/2002 208.54 208.54 187.75 - 0.00 187.75 20.79 ---- 21.00 21.00 Nil ---- ---- 2005-06 road via Alubari & Digaru ghat C/o RCC Bridge over river Bereng 4 Patum Rumgong Road 27/08/2002 719.00 762.30 788.93 - - 788.93 2005-06 Complted 5 By pass road to Roing 28/11/2002 288.45 288.45 308.78 0.00 0.00 308.78 ---- ---- ---- Nil ---- ---- 2005-06 township 6 C/o PSC girder and RCC 28/3/2003 305.88 334.05 150.71 - - 150.71 183.34 ---- 125.00 125.00 ---- ---- ---- 2006-07 slab composite bridge over river Buri - Dihing (Span – 120.00 mtr). 7 Construction of 27/2/2004 345.18 363.35 171.40 0.00 0.00 171.40 295.00 ---- 100.00 100.00 ---- ---- ---- 2006-07 Mebo-Dholla road (Ph-II) 8 Impvt. Of Yingkiong 31/03/2005 230.00 227.49 230.00 0.00 0.00 230.00 2006-07 Complted Township road. 9 Impvt. Of Jirdin VKV 31/03/2005 152.48 158.57 174.01 - - 174.01 2006-07 Complted road to JNV School at Taraso Mobuk. 10 Extension and resurfacing 244.80 257.00 124.69 - - 124.60 132.40 100.00 100.00 2008-09 of Basar township road

8<br />

State : Arunachal Pradesh<br />

Department : PWD<br />

Sl. Name of work<br />

No.<br />

Date of<br />

Sancti<strong>on</strong><br />

Org.<br />

Sancti<strong>on</strong><br />

amount<br />

Org.<br />

Likely cost<br />

of<br />

completi<strong>on</strong><br />

Upto <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

end of<br />

previous<br />

year<br />

STATUS OF <strong>CRF</strong> WORK LIABILITIES (ROADS)<br />

As <strong>on</strong> <str<strong>on</strong>g>June</str<strong>on</strong>g> <str<strong>on</strong>g>2007</str<strong>on</strong>g><br />

During<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> Qtr<br />

i.e.1st<br />

qtr<br />

Total<br />

during <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

year<br />

Cummulative<br />

upto end of<br />

qtr. under<br />

report<br />

Balance<br />

Requirement of fund <str<strong>on</strong>g>2007</str<strong>on</strong>g>-08<br />

Positi<strong>on</strong> of revised estimate<br />

(Col 5 - 9) Liability <strong>Works</strong> Total Required Submit Date<br />

PDC<br />

Remarks<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18<br />

1 Steel truss girder bridge 23/10/2001 434.88 442.00 474.91 0.00 0.00 474.91 ---- 4.00 4.00 Nil ---- ---- 2005-06<br />

over river Dibang<br />

2 C<strong>on</strong>structi<strong>on</strong> of 23/10/2001 1005.50 1081.00 795.64 - - 795.64 285.36 ---- 100.00 100.00 Nil ---- ---- 2005-06<br />

Mebo-Dholla road<br />

3 C/o Chowkham -Tezu 27/05/2002 208.54 208.54 187.75 - 0.00 187.75 20.79 ---- 21.00 21.00 Nil ---- ---- 2005-06<br />

road via Alubari & Digaru<br />

ghat C/o RCC Bridge over<br />

river Bereng<br />

4 Patum Rumg<strong>on</strong>g Road 27/08/2002 719.00 762.30 788.93 - - 788.93 2005-06 Complted<br />

5 By pass road to Roing 28/11/2002 288.45 288.45 308.78 0.00 0.00 308.78 ---- ---- ---- Nil ---- ---- 2005-06<br />

township<br />

6 C/o PSC girder and RCC 28/3/2003 305.88 334.05 150.71 - - 150.71 183.34 ---- 125.00 125.00 ---- ---- ---- 2006-07<br />

slab composite bridge<br />

over river Buri - Dihing<br />

(Span – 120.00 mtr).<br />

7 C<strong>on</strong>structi<strong>on</strong> of 27/2/2004 345.18 363.35 171.40 0.00 0.00 171.40 295.00 ---- 100.00 100.00 ---- ---- ---- 2006-07<br />

Mebo-Dholla road (Ph-II)<br />

8 Impvt. Of Yingki<strong>on</strong>g 31/03/2005 230.00 227.49 230.00 0.00 0.00 230.00 2006-07 Complted<br />

Township road.<br />

9 Impvt. Of Jirdin VKV 31/03/2005 152.48 158.57 174.01 - - 174.01 2006-07 Complted<br />

road to JNV School<br />

at Taraso Mobuk.<br />

10 Extensi<strong>on</strong> and resurfacing 244.80 257.00 124.69 - - 124.60 132.40 100.00 100.00 2008-09<br />