Name of work<br />

Length in<br />

AA No. & Date &<br />

Amount<br />

Amount of<br />

Technical<br />

sanct<strong>on</strong> &<br />

Date<br />

Item quantity unit<br />

1 2 3 4 5 6 7 8 9<br />

10<br />

11<br />

12<br />

13 14 15 16 17<br />

13 Bypass road to 7.80 km No.<strong>NH</strong>-12031/145/ --- Widening 4.10 km 90.00 % - - 90.00 % 313.91 313.91<br />

Bomdila township 01/ AR-P/<strong>CRF</strong>/<strong>NH</strong>-10 R/Wall & B wall 706.00 m 78.00 % - - 78.00 %<br />

from BRTF road via dtd. 27/05/2002 R/Wall 3m ht. 300.00 m 3.00 % - - 3.00 %<br />

New Bomdila 314.75 R/Wall 4m ht. 28.00 m 3.00 % - - 3.00 %<br />

R/wall 5m ht 25.00 m 3.00 % - - 3.00 %<br />

B/wall 353.00 m 3.00 % - - 3.00 %<br />

Slab culvert 1m span 20.00 nos 98.00 % - - 98.00 %<br />

Slab culvert 3m span 2.00 nos 100.00 % - - 100.00 %<br />

WBM-I 3.80 km 100.00 % - - 100.00 %<br />

WBM-II 4.80 km 72.00 % - - 72.00 %<br />

WBM-III 7.80 km 61.00 % - - 61.00 %<br />

Carpeting 7.80 km 46.00 % - - 46.00 %<br />

Cc drain 7.76 km 15.00 % - - 15.00 %<br />

Page 5<br />

Scope of work Physical Progress in %<br />

Financial Progress Remarks<br />

Upto <str<strong>on</strong>g>the</str<strong>on</strong>g> end During <str<strong>on</strong>g>the</str<strong>on</strong>g> Total during <str<strong>on</strong>g>the</str<strong>on</strong>g> Cummulative Upto <str<strong>on</strong>g>the</str<strong>on</strong>g> During Total Cummulat<br />

of previous Qtr i.e.1st year upto end of qtr. end of <str<strong>on</strong>g>the</str<strong>on</strong>g> Qtr during <str<strong>on</strong>g>the</str<strong>on</strong>g> ive upto<br />

year (2006-<br />

under report previous<br />

year end of qtr.<br />

Qtr.<br />

i.e. 1st<br />

<str<strong>on</strong>g>2007</str<strong>on</strong>g>)<br />

year<br />

under<br />

qtr<br />

report<br />

14 Impvt. & 9.609 km No.<strong>NH</strong>-12031/142/ --- Widening 4.80 km 100.00 % - - 100.00 % 188.85 - - 188.85<br />

upgradati<strong>on</strong> of 01/ AR-P/<strong>CRF</strong>/<strong>NH</strong>-10 WBM-I 5.036 km 100.00 % - - 100.00 %<br />

bypass from dtd. 27/05/2002 WBM-II 5.036 km 100.00 % - - 100.00 %<br />

Bomdir <strong>on</strong> BRTF 188.79 WBM-III 5.036 km 100.00 % - - 100.00 %<br />

road to District Carpeting 2.67 km 100.00 % - - 100.00 %<br />

Headquater at Recarpeting 2.84 km 100.00 % - - 100.00 %<br />

Tawang Slab culvert 1m span 4.00 nos 100.00 % - - 100.00 %<br />

Slab culvert 2m span 4.00 nos 100.00 % - - 100.00 %<br />

R/Wall 125.00 m 100.00 % - - 100.00 %<br />

Drain 0.96 km 100.00 % - - 100.00 %<br />

15 Improvement of 13.10 km <strong>NH</strong>/12031/7/2004 313.46 WBM-I 13.10 Km 5.00 % - - 5.00 275.71 275.71<br />

road from dirang - /Ar.P/<strong>CRF</strong>/<strong>NH</strong>-10 13/03/04 WBM-II 13.10 km 55.00 % - - 55.00 %<br />

Tawang road to Dated 27.02.2004. WBM-III 10.00 km - - 10.00 km<br />

G<strong>on</strong>patcher to 327.39 Carpeting 13.10 km 35.00 % - - 35.00 %<br />

c<strong>on</strong>nect NRC <strong>on</strong> Widening 0.05 km - - 0.05 km<br />

Yak Culvert-1m span 15.00 Nos 133.00 % - - 133.00 %<br />

Retaining wall/breast wal 318.00 91.00 % - - 91.00 %<br />

Retaining wall 3m ht 210.00 m - - -<br />

Breast wall 108.00 m - - -<br />

CC drain 2,500.00 m 5.00 % - - 5.00 %<br />

Temp accommodati<strong>on</strong> 1.00 Nos 100.00 % - - 100.00 %<br />

Special T&P<br />

a) Truck 1.00 Nos<br />

b) Roller 1.00 Nos<br />

16 C/O Road from 15.00 Km No.<strong>NH</strong>-12031/15/ 581.00 Widening 12.00 km 74.00 % - - 74.00 % 315.00 315.00<br />

Khenewa CO 2004/Ar.P/<strong>CRF</strong>/<strong>NH</strong>-10 27/02/04 Side drain 15.00 km - -<br />

Hq.to Seppa - Dtd. 27.02.2004 Culvert 1.5 m span 61.00 nos 15.19 % - - 15.19 %<br />

Chyangtajo via 581.00 Culvert 4 m span 2.00 nos 300.00 % - - 300.00 %<br />

Purdung and Culvert 6 m span 4.00 nos 100.00 % - - 100.00 %<br />

Pakke vill. R/wall 3m height 600.00 m 13.00 - - 13.00 %<br />

Soling 15.00 km 2.00 % - - 2.00 %<br />

Metalling 15.00 km<br />

Carpeting 15.00 km<br />

Km st<strong>on</strong>e and road sign 15.00 km<br />