Sl.<br />
No.<br />
Name of work<br />
Length in<br />
AA No. & Date &<br />
Amount<br />
Amount of<br />
Technical<br />
sanct<strong>on</strong> &<br />
Date<br />
Item quantity unit<br />
1 2 3 4 5 6 7 8 9<br />
10<br />
11<br />
12<br />
13 14 15 16 17<br />
13 Bypass road to 7.80 km No.<strong>NH</strong>-12031/145/ --- Widening 4.10 km 90.00 % - - 90.00 % 313.91 313.91<br />
Bomdila township 01/ AR-P/<strong>CRF</strong>/<strong>NH</strong>-10 R/Wall & B wall 706.00 m 78.00 % - - 78.00 %<br />
from BRTF road via dtd. 27/05/2002 R/Wall 3m ht. 300.00 m 3.00 % - - 3.00 %<br />
New Bomdila 314.75 R/Wall 4m ht. 28.00 m 3.00 % - - 3.00 %<br />
R/wall 5m ht 25.00 m 3.00 % - - 3.00 %<br />
B/wall 353.00 m 3.00 % - - 3.00 %<br />
Slab culvert 1m span 20.00 nos 98.00 % - - 98.00 %<br />
Slab culvert 3m span 2.00 nos 100.00 % - - 100.00 %<br />
WBM-I 3.80 km 100.00 % - - 100.00 %<br />
WBM-II 4.80 km 72.00 % - - 72.00 %<br />
WBM-III 7.80 km 61.00 % - - 61.00 %<br />
Carpeting 7.80 km 46.00 % - - 46.00 %<br />
Cc drain 7.76 km 15.00 % - - 15.00 %<br />
Page 5<br />
Scope of work Physical Progress in %<br />
Financial Progress Remarks<br />
Upto <str<strong>on</strong>g>the</str<strong>on</strong>g> end During <str<strong>on</strong>g>the</str<strong>on</strong>g> Total during <str<strong>on</strong>g>the</str<strong>on</strong>g> Cummulative Upto <str<strong>on</strong>g>the</str<strong>on</strong>g> During Total Cummulat<br />
of previous Qtr i.e.1st year upto end of qtr. end of <str<strong>on</strong>g>the</str<strong>on</strong>g> Qtr during <str<strong>on</strong>g>the</str<strong>on</strong>g> ive upto<br />
year (2006-<br />
under report previous<br />
year end of qtr.<br />
Qtr.<br />
i.e. 1st<br />
<str<strong>on</strong>g>2007</str<strong>on</strong>g>)<br />
year<br />
under<br />
qtr<br />
report<br />
14 Impvt. & 9.609 km No.<strong>NH</strong>-12031/142/ --- Widening 4.80 km 100.00 % - - 100.00 % 188.85 - - 188.85<br />
upgradati<strong>on</strong> of 01/ AR-P/<strong>CRF</strong>/<strong>NH</strong>-10 WBM-I 5.036 km 100.00 % - - 100.00 %<br />
bypass from dtd. 27/05/2002 WBM-II 5.036 km 100.00 % - - 100.00 %<br />
Bomdir <strong>on</strong> BRTF 188.79 WBM-III 5.036 km 100.00 % - - 100.00 %<br />
road to District Carpeting 2.67 km 100.00 % - - 100.00 %<br />
Headquater at Recarpeting 2.84 km 100.00 % - - 100.00 %<br />
Tawang Slab culvert 1m span 4.00 nos 100.00 % - - 100.00 %<br />
Slab culvert 2m span 4.00 nos 100.00 % - - 100.00 %<br />
R/Wall 125.00 m 100.00 % - - 100.00 %<br />
Drain 0.96 km 100.00 % - - 100.00 %<br />
15 Improvement of 13.10 km <strong>NH</strong>/12031/7/2004 313.46 WBM-I 13.10 Km 5.00 % - - 5.00 275.71 275.71<br />
road from dirang - /Ar.P/<strong>CRF</strong>/<strong>NH</strong>-10 13/03/04 WBM-II 13.10 km 55.00 % - - 55.00 %<br />
Tawang road to Dated 27.02.2004. WBM-III 10.00 km - - 10.00 km<br />
G<strong>on</strong>patcher to 327.39 Carpeting 13.10 km 35.00 % - - 35.00 %<br />
c<strong>on</strong>nect NRC <strong>on</strong> Widening 0.05 km - - 0.05 km<br />
Yak Culvert-1m span 15.00 Nos 133.00 % - - 133.00 %<br />
Retaining wall/breast wal 318.00 91.00 % - - 91.00 %<br />
Retaining wall 3m ht 210.00 m - - -<br />
Breast wall 108.00 m - - -<br />
CC drain 2,500.00 m 5.00 % - - 5.00 %<br />
Temp accommodati<strong>on</strong> 1.00 Nos 100.00 % - - 100.00 %<br />
Special T&P<br />
a) Truck 1.00 Nos<br />
b) Roller 1.00 Nos<br />
16 C/O Road from 15.00 Km No.<strong>NH</strong>-12031/15/ 581.00 Widening 12.00 km 74.00 % - - 74.00 % 315.00 315.00<br />
Khenewa CO 2004/Ar.P/<strong>CRF</strong>/<strong>NH</strong>-10 27/02/04 Side drain 15.00 km - -<br />
Hq.to Seppa - Dtd. 27.02.2004 Culvert 1.5 m span 61.00 nos 15.19 % - - 15.19 %<br />
Chyangtajo via 581.00 Culvert 4 m span 2.00 nos 300.00 % - - 300.00 %<br />
Purdung and Culvert 6 m span 4.00 nos 100.00 % - - 100.00 %<br />
Pakke vill. R/wall 3m height 600.00 m 13.00 - - 13.00 %<br />
Soling 15.00 km 2.00 % - - 2.00 %<br />
Metalling 15.00 km<br />
Carpeting 15.00 km<br />
Km st<strong>on</strong>e and road sign 15.00 km<br />
<strong>CRF</strong>/<str<strong>on</strong>g>QPR</str<strong>on</strong>g> <strong>CRF</strong> <str<strong>on</strong>g>June</str<strong>on</strong>g> <str<strong>on</strong>g>2007</str<strong>on</strong>g>