QPR for the quarter ending June/2007 on NH, CRF Works submitted ...
QPR for the quarter ending June/2007 on NH, CRF Works submitted ...
QPR for the quarter ending June/2007 on NH, CRF Works submitted ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
17<br />
Appendix III. Pro<str<strong>on</strong>g>for</str<strong>on</strong>g>ma-VIII<br />
State : Arunachal Pradesh<br />
Update <str<strong>on</strong>g>June</str<strong>on</strong>g>'07<br />
DETAILS OF SPEED BREAKERS ON NATIONAL HIGHWAYS<br />
Sl. No. <strong>NH</strong> No. Locati<strong>on</strong> of speed Breaker Whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r located in urban Target date of removal Reas<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> not removing <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
(Kilometerage and secti<strong>on</strong> built up area / rural area / /replacement by rumble speed breakers / replacement<br />
in which located) near intersecti<strong>on</strong> /near level strips<br />
by<br />
crossing<br />
1 2 3 4 5 6<br />
Sub Total : -------------------------------------- -----------------Nil------------------ ------------------------------------------------------------------------<br />
(Indicating Nos )<br />
Sub Total :<br />
(Indicating Nos )<br />
Sub Total :<br />
(Indicating Nos )<br />
Chief Engineer (EZ),<br />
PWD, AP, Itanagar<br />
Page 17