08.01.2015 Views

QPR for the quarter ending June/2007 on NH, CRF Works submitted ...

QPR for the quarter ending June/2007 on NH, CRF Works submitted ...

QPR for the quarter ending June/2007 on NH, CRF Works submitted ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

17<br />

Appendix III. Pro<str<strong>on</strong>g>for</str<strong>on</strong>g>ma-VIII<br />

State : Arunachal Pradesh<br />

Update <str<strong>on</strong>g>June</str<strong>on</strong>g>'07<br />

DETAILS OF SPEED BREAKERS ON NATIONAL HIGHWAYS<br />

Sl. No. <strong>NH</strong> No. Locati<strong>on</strong> of speed Breaker Whe<str<strong>on</strong>g>the</str<strong>on</strong>g>r located in urban Target date of removal Reas<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> not removing <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

(Kilometerage and secti<strong>on</strong> built up area / rural area / /replacement by rumble speed breakers / replacement<br />

in which located) near intersecti<strong>on</strong> /near level strips<br />

by<br />

crossing<br />

1 2 3 4 5 6<br />

Sub Total : -------------------------------------- -----------------Nil------------------ ------------------------------------------------------------------------<br />

(Indicating Nos )<br />

Sub Total :<br />

(Indicating Nos )<br />

Sub Total :<br />

(Indicating Nos )<br />

Chief Engineer (EZ),<br />

PWD, AP, Itanagar<br />

Page 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!