16 Appendix III. Proong>forong>ma - VII State : Arunachal Pradesh Update ong>Juneong>'07 STATUS OF INVENTORISATION OF BRIDGE ON NATIONAL HIGHWAYS (Ministry's circular No. RW/NH-33054/33/88.D.O. II date ong>theong> 29/03/89) and DG(B)'s D.O. Letter of even number dated ong>theong> 7th Jan. 1991 refers. Sl. No. NH No. Total No. Inventory data already submitted (Number) Inventory data under Target date of Inventory data collection/compilation submission of data still to be ong>2007ong>-2008 2008-2009 (Number) of MOST collected Target date of submission 1 2 3 4 5 6 7 8 9 10 Remarks/ bottlenecks restraints 1 NH-153 4Nos. --- No. CEAP (EZ)/WTC- Nil Nil Nil Nil 10(MOST-NH)/2001- 02/5351-53 dtd. 24/11/2001 Additional inong>forong>mation submitted vide no. CEAP(EZ)/WTC- 10/MOST-NH/04- 05/1636-39 Dtd. 19/08/04 Chief Engineer (EZ), PWD, AP, Itanagar Page 16

17 Appendix III. Proong>forong>ma-VIII State : Arunachal Pradesh Update ong>Juneong>'07 DETAILS OF SPEED BREAKERS ON NATIONAL HIGHWAYS Sl. No. NH No. Location of speed Breaker Wheong>theong>r located in urban Target date of removal Reasons ong>forong> not removing ong>theong> (Kilometerage and section built up area / rural area / /replacement by rumble speed breakers / replacement in which located) near intersection /near level strips by crossing 1 2 3 4 5 6 Sub Total : -------------------------------------- -----------------Nil------------------ ------------------------------------------------------------------------ (Indicating Nos ) Sub Total : (Indicating Nos ) Sub Total : (Indicating Nos ) Chief Engineer (EZ), PWD, AP, Itanagar Page 17

16<br />

Appendix III. Pro<str<strong>on</strong>g>for</str<strong>on</strong>g>ma - VII<br />

State : Arunachal Pradesh<br />

Update <str<strong>on</strong>g>June</str<strong>on</strong>g>'07<br />

STATUS OF INVENTORISATION OF BRIDGE ON NATIONAL HIGHWAYS<br />

(Ministry's circular No. RW/<strong>NH</strong>-33054/33/88.D.O. II date <str<strong>on</strong>g>the</str<strong>on</strong>g> 29/03/89) and DG(B)'s D.O. Letter of even number dated <str<strong>on</strong>g>the</str<strong>on</strong>g> 7th Jan. 1991 refers.<br />

Sl. No. <strong>NH</strong> No. Total No. Inventory data already <strong>submitted</strong> (Number) Inventory data under Target date of Inventory data<br />

collecti<strong>on</strong>/compilati<strong>on</strong> submissi<strong>on</strong> of data still to be<br />

<str<strong>on</strong>g>2007</str<strong>on</strong>g>-2008 2008-2009<br />

(Number)<br />

of MOST collected<br />

Target date of<br />

submissi<strong>on</strong><br />

1 2 3 4 5 6 7 8 9 10<br />

Remarks/<br />

bottlenecks<br />

restraints<br />

1 <strong>NH</strong>-153 4Nos. --- No. CEAP (EZ)/WTC-<br />

Nil Nil Nil Nil<br />

10(MOST-<strong>NH</strong>)/2001-<br />

02/5351-53 dtd.<br />

24/11/2001<br />

Additi<strong>on</strong>al<br />

in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong><br />

<strong>submitted</strong> vide no.<br />

CEAP(EZ)/WTC-<br />

10/MOST-<strong>NH</strong>/04-<br />

05/1636-39 Dtd.<br />

19/08/04<br />

Chief Engineer (EZ),<br />

PWD, AP, Itanagar<br />

Page 16