12 (MOST Letter No. RW/NH-11030/1/90 idt. The 08/03/90 and (ii) RW/NH-11030/1/89-D.O.I. dt. 25/03/91 refers). STATUS OF PREPARATION OF LAND PLANS Appendix III. Pro
13 STATUS OF PLANTATION OF TREES ALONG NATIONAL HIGHWAYS. (MOST Letter No. RW/NH-11030/1/90 idt. The 08/03/90 and (ii) RW/NH-11030/1/89-D.O.I. dt. 25/03/91 refers). Appendix III. Pro
- Page 1 and 2: GOVERNMENT OF ARUNACHAL PRADESH OFF
- Page 3 and 4: Name of Division:- Jairampur NH Div
- Page 5 and 6: ABSTRACT OF FUND REQUIREMENT FOR ON
- Page 7 and 8: 5 Annexure-II Sl. No. NH No. Name o
- Page 9 and 10: 7 STATUS OF IRQ PROGRAMME State: Ar
- Page 11 and 12: 9 STATUS OF SPECIAL RENEWAL PROGRAM
- Page 13: 11 (MOST Letter No. RW/NH-11030/1/8
- Page 17 and 18: 15 Appendix III. Profor</st
- Page 19 and 20: 17 Appendix III. Profor</st
- Page 21 and 22: 19 (A) STATUS OF CHECK BARRIERS ON
- Page 23 and 24: 21 100% 90% 80% 70% 60% 50% 40% 30%
- Page 25 and 26: 23 100% 90% 80% 70% 60% 50% 40% 30%
- Page 27 and 28: 25 100% 90% 80% 70% 60% 50% 40% 30%
- Page 29 and 30: State : Arunachal Pradesh Departmen
- Page 31 and 32: Government of Arunachal Pradesh Pub
- Page 33 and 34: 2 Sl. No. Name of work Length in AA
- Page 35 and 36: 4 Sl. No. Name of work Length in AA
- Page 37 and 38: 6 Sl. No. Name of work Length in AA
- Page 39 and 40: 8 State : Arunachal Pradesh Departm
- Page 41: 10 Sl. No. Name of work Date of San
12<br />
(MOST Letter No. RW/<strong>NH</strong>-11030/1/90 idt. The 08/03/90 and (ii) RW/<strong>NH</strong>-11030/1/89-D.O.I. dt. 25/03/91 refers).<br />
STATUS OF PREPARATION OF LAND PLANS<br />
Appendix III. Pro<str<strong>on</strong>g>for</str<strong>on</strong>g>ma V<br />
State:Arunachal Pradesh<br />
Update <str<strong>on</strong>g>June</str<strong>on</strong>g>'07<br />
Sl.No. <strong>NH</strong>. No. Length <strong>NH</strong> Length <str<strong>on</strong>g>for</str<strong>on</strong>g> which land plans Length <str<strong>on</strong>g>for</str<strong>on</strong>g> which land plans Balance length Length plans under Target date <str<strong>on</strong>g>for</str<strong>on</strong>g> Programme <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> balance Length <str<strong>on</strong>g>for</str<strong>on</strong>g> Remarks<br />
in <str<strong>on</strong>g>the</str<strong>on</strong>g> state have been completed have been au<str<strong>on</strong>g>the</str<strong>on</strong>g>nticated by (Km.) <str<strong>on</strong>g>for</str<strong>on</strong>g> which preparati<strong>on</strong> as <strong>on</strong> completi<strong>on</strong><br />
length<br />
which <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
(Km.) Upto 3/07 Upto 06/07 Upto 3/07 Upto 06/07 length plans are 6/07<br />
Length Target date <str<strong>on</strong>g>for</str<strong>on</strong>g> land stands<br />
still to be<br />
completi<strong>on</strong> tranferred in<br />
prepared as <strong>on</strong><br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> name of<br />
6/07<br />
Govt. of India<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />
1 153 32.485 Km. -- --- --- --- 32.485 km Mar.'08 32.485 km. Mar.'08 32.485 km.<br />
Government<br />
land<br />
Chief Engineer (EZ),<br />
PWD, AP, Itanagar<br />
Page 12