12 (MOST Letter No. RW/NH-11030/1/90 idt. The 08/03/90 and (ii) RW/NH-11030/1/89-D.O.I. dt. 25/03/91 refers). STATUS OF PREPARATION OF LAND PLANS Appendix III. Proong>forong>ma V State:Arunachal Pradesh Update ong>Juneong>'07 Sl.No. NH. No. Length NH Length ong>forong> which land plans Length ong>forong> which land plans Balance length Length plans under Target date ong>forong> Programme ong>forong> ong>theong> balance Length ong>forong> Remarks in ong>theong> state have been completed have been auong>theong>nticated by (Km.) ong>forong> which preparation as on completion length which ong>theong> (Km.) Upto 3/07 Upto 06/07 Upto 3/07 Upto 06/07 length plans are 6/07 Length Target date ong>forong> land stands still to be completion tranferred in prepared as on ong>theong> name of 6/07 Govt. of India 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 153 32.485 Km. -- --- --- --- 32.485 km Mar.'08 32.485 km. Mar.'08 32.485 km. Government land Chief Engineer (EZ), PWD, AP, Itanagar Page 12

13 STATUS OF PLANTATION OF TREES ALONG NATIONAL HIGHWAYS. (MOST Letter No. RW/NH-11030/1/90 idt. The 08/03/90 and (ii) RW/NH-11030/1/89-D.O.I. dt. 25/03/91 refers). Appendix III. Proong>forong>ma V State : Arunachal Pradesh Update ong>Juneong>'07 Sl.No. Length NH in ong>theong> state (Km.) Length of NH where plantation has been completed Balance length (Km.) Length of NH where plantation cannot be Programme ong>forong> balance length where plantation has to be done Upto 3/07 Upto 6/07 done/ is not required due to local condition (Km.) Kms. Target to be completed by Agency ong>forong> Remarks 1 2 3 4 5 6 7 8 9 10 1 32.485 Km. --- --- 32.485 Km. 15.00km. 17.485 km. 2009-10 (this includes township area & Jungle portion) State PWD, Arunachal Pradesh "or" Forest deptt. Of A.P. Plantation will be taken only after completion of ong>theong> road into intermediate/double lane status. Chief Engineer (EZ), PWD, AP, Itanagar Page 13

12<br />

(MOST Letter No. RW/<strong>NH</strong>-11030/1/90 idt. The 08/03/90 and (ii) RW/<strong>NH</strong>-11030/1/89-D.O.I. dt. 25/03/91 refers).<br />

STATUS OF PREPARATION OF LAND PLANS<br />

Appendix III. Pro<str<strong>on</strong>g>for</str<strong>on</strong>g>ma V<br />

State:Arunachal Pradesh<br />

Update <str<strong>on</strong>g>June</str<strong>on</strong>g>'07<br />

Sl.No. <strong>NH</strong>. No. Length <strong>NH</strong> Length <str<strong>on</strong>g>for</str<strong>on</strong>g> which land plans Length <str<strong>on</strong>g>for</str<strong>on</strong>g> which land plans Balance length Length plans under Target date <str<strong>on</strong>g>for</str<strong>on</strong>g> Programme <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> balance Length <str<strong>on</strong>g>for</str<strong>on</strong>g> Remarks<br />

in <str<strong>on</strong>g>the</str<strong>on</strong>g> state have been completed have been au<str<strong>on</strong>g>the</str<strong>on</strong>g>nticated by (Km.) <str<strong>on</strong>g>for</str<strong>on</strong>g> which preparati<strong>on</strong> as <strong>on</strong> completi<strong>on</strong><br />

length<br />

which <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

(Km.) Upto 3/07 Upto 06/07 Upto 3/07 Upto 06/07 length plans are 6/07<br />

Length Target date <str<strong>on</strong>g>for</str<strong>on</strong>g> land stands<br />

still to be<br />

completi<strong>on</strong> tranferred in<br />

prepared as <strong>on</strong><br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> name of<br />

6/07<br />

Govt. of India<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />

1 153 32.485 Km. -- --- --- --- 32.485 km Mar.'08 32.485 km. Mar.'08 32.485 km.<br />

Government<br />

land<br />

Chief Engineer (EZ),<br />

PWD, AP, Itanagar<br />

Page 12