10 STATUS OF FDR (CONTINUING WORKS) Annexure-IV State: Arunachal Pradesh Code : Roads Month of Review
11 (MOST Letter No. RW/NH-11030/1/87 - D.O.I. Dated
- Page 1 and 2: GOVERNMENT OF ARUNACHAL PRADESH OFF
- Page 3 and 4: Name of Division:- Jairampur NH Div
- Page 5 and 6: ABSTRACT OF FUND REQUIREMENT FOR ON
- Page 7 and 8: 5 Annexure-II Sl. No. NH No. Name o
- Page 9 and 10: 7 STATUS OF IRQ PROGRAMME State: Ar
- Page 11: 9 STATUS OF SPECIAL RENEWAL PROGRAM
- Page 15 and 16: 13 STATUS OF PLANTATION OF TREES AL
- Page 17 and 18: 15 Appendix III. Profor</st
- Page 19 and 20: 17 Appendix III. Profor</st
- Page 21 and 22: 19 (A) STATUS OF CHECK BARRIERS ON
- Page 23 and 24: 21 100% 90% 80% 70% 60% 50% 40% 30%
- Page 25 and 26: 23 100% 90% 80% 70% 60% 50% 40% 30%
- Page 27 and 28: 25 100% 90% 80% 70% 60% 50% 40% 30%
- Page 29 and 30: State : Arunachal Pradesh Departmen
- Page 31 and 32: Government of Arunachal Pradesh Pub
- Page 33 and 34: 2 Sl. No. Name of work Length in AA
- Page 35 and 36: 4 Sl. No. Name of work Length in AA
- Page 37 and 38: 6 Sl. No. Name of work Length in AA
- Page 39 and 40: 8 State : Arunachal Pradesh Departm
- Page 41: 10 Sl. No. Name of work Date of San
11<br />
(MOST Letter No. RW/<strong>NH</strong>-11030/1/87 - D.O.I. Dated <str<strong>on</strong>g>the</str<strong>on</strong>g> 25th March 1991 refers).<br />
STATUS OF ACQUISITION OF LAND FOR NATIONAL HIGHWAYS<br />
Appendix III. Pro<str<strong>on</strong>g>for</str<strong>on</strong>g>ma IV<br />
State : Arunachal Pradesh<br />
Update <str<strong>on</strong>g>June</str<strong>on</strong>g>'07<br />
Sl.No. <strong>NH</strong>.No. Length <strong>NH</strong> in<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> State<br />
(Km.)<br />
Length <str<strong>on</strong>g>for</str<strong>on</strong>g> which<br />
land width<br />
c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>ming <strong>NH</strong><br />
std. is available<br />
Length <str<strong>on</strong>g>for</str<strong>on</strong>g> which<br />
addl. Width to<br />
c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>m to <strong>NH</strong><br />
std. is still to be<br />
STATUS OF ESTIMATES FOR ADDITIONAL WIDTH<br />
Already Submitted<br />
Under preparati<strong>on</strong><br />
Length in Nos. Amount in Balance in Estimated Programme <str<strong>on</strong>g>for</str<strong>on</strong>g> submissi<strong>on</strong><br />
Km.<br />
Rs. Lakhs length amount of estimate to acquire<br />
(Km.) acquired (Km.) covered<br />
required in Rs. addl.Width.<br />
1 2 3 4 5 6 7 8 9 10 11 12<br />
Remarks<br />
1 <strong>NH</strong>-153 32.485 26.00 6.485 (appx) ---- ---- ---- ---- ---- ----<br />
(6.485 km road stretch<br />
falls within Tea-Garden<br />
& Reserve <str<strong>on</strong>g>for</str<strong>on</strong>g>est area)<br />
Chief Engineer (EZ),<br />
PWD, AP, Itanagar<br />