10 STATUS OF FDR (CONTINUING WORKS) Annexure-IV State: Arunachal Pradesh Code : Roads Month of Review ong>Juneong>'07 Amount Rs. In lakhs Sl.No. Name of work. Job No. Date of Sanctioned Sanctioned amount Date of comencement Cummulative Expenditure Cummulative Physical Progress Mar-07 Jun-07 Mar-07 Jun-07 Target date of completion Requirement of funds during ong>2007ong>-08 Remarks/reason ong>forong> delay in brief 1 2 3 4 5 6 7 8 9 10 11 12 1 FDR 05-06 NH-13012/15/2006/Ar.P/NH-10 13.99 04-01-05 9.37 9.37 100% 100% March'07 4.62 - Dt. 31/03/06 2 FDR 2006-07 (New) NH-13012/23/ong>2007ong>/Ar.P/NH-10 19.91 04-01-06 - - 10% 20% March'08 19.91 Dt 29/03/ong>2007ong> Sanctioned ong>forong> Rs. 19.91 Lacs in March'07 Chief Engineer (EZ), PWD, AP, Itanagar Page 10

11 (MOST Letter No. RW/NH-11030/1/87 - D.O.I. Dated ong>theong> 25th March 1991 refers). STATUS OF ACQUISITION OF LAND FOR NATIONAL HIGHWAYS Appendix III. Proong>forong>ma IV State : Arunachal Pradesh Update ong>Juneong>'07 Sl.No. NH.No. Length NH in ong>theong> State (Km.) Length ong>forong> which land width conong>forong>ming NH std. is available Length ong>forong> which addl. Width to conong>forong>m to NH std. is still to be STATUS OF ESTIMATES FOR ADDITIONAL WIDTH Already Submitted Under preparation Length in Nos. Amount in Balance in Estimated Programme ong>forong> submission Km. Rs. Lakhs length amount of estimate to acquire (Km.) acquired (Km.) covered required in Rs. addl.Width. 1 2 3 4 5 6 7 8 9 10 11 12 Remarks 1 NH-153 32.485 26.00 6.485 (appx) ---- ---- ---- ---- ---- ---- (6.485 km road stretch falls within Tea-Garden & Reserve ong>forong>est area) Chief Engineer (EZ), PWD, AP, Itanagar Page 11

11<br />

(MOST Letter No. RW/<strong>NH</strong>-11030/1/87 - D.O.I. Dated <str<strong>on</strong>g>the</str<strong>on</strong>g> 25th March 1991 refers).<br />

STATUS OF ACQUISITION OF LAND FOR NATIONAL HIGHWAYS<br />

Appendix III. Pro<str<strong>on</strong>g>for</str<strong>on</strong>g>ma IV<br />

State : Arunachal Pradesh<br />

Update <str<strong>on</strong>g>June</str<strong>on</strong>g>'07<br />

Sl.No. <strong>NH</strong>.No. Length <strong>NH</strong> in<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> State<br />

(Km.)<br />

Length <str<strong>on</strong>g>for</str<strong>on</strong>g> which<br />

land width<br />

c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>ming <strong>NH</strong><br />

std. is available<br />

Length <str<strong>on</strong>g>for</str<strong>on</strong>g> which<br />

addl. Width to<br />

c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>m to <strong>NH</strong><br />

std. is still to be<br />

STATUS OF ESTIMATES FOR ADDITIONAL WIDTH<br />

Already Submitted<br />

Under preparati<strong>on</strong><br />

Length in Nos. Amount in Balance in Estimated Programme <str<strong>on</strong>g>for</str<strong>on</strong>g> submissi<strong>on</strong><br />

Km.<br />

Rs. Lakhs length amount of estimate to acquire<br />

(Km.) acquired (Km.) covered<br />

required in Rs. addl.Width.<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

Remarks<br />

1 <strong>NH</strong>-153 32.485 26.00 6.485 (appx) ---- ---- ---- ---- ---- ----<br />

(6.485 km road stretch<br />

falls within Tea-Garden<br />

& Reserve <str<strong>on</strong>g>for</str<strong>on</strong>g>est area)<br />

Chief Engineer (EZ),<br />

PWD, AP, Itanagar<br />

Page 11